离岸价格
获取最新报价( Negotiable )
|Minimum Order
位置:
FOSHAN CHINA
最小订单价格:
-
最小订单:
1 Ton
包装细节:
pieces /bundle with plastic film protection
交货时间:
25-30 days after deposit payment
供应能力:
1000 Ton per Month
付款方式:
T/T
联系人 Mr. Ivan
Dachong Industrial Zone,Lishui Town, Nanhai District, Foshan City, Guangdong
Product
Description: 1) Extruded by Aluminum ***3 or ***1, Temper is 5 and 6 2) Surface treatment we can do: Anodizing, Powder Coating, wooden effect, Polishing, Brushing, Electroplate, Electrophoresis, Silk-Screen. Etc 3) Sampling Lead Time within *5 days for extrusion profiles, Production Lead Time: During ***5 4) shape and size and materials are available in accordance with customers' options 5) available fabrication works: Milling, drilling, cutting, punching, assembling, welding etc |
|