离岸价格
获取最新报价10 ~ 20 / Piece ( Negotiable )
|Minimum Order
位置:
Tianjin
最小订单价格:
最小订单:
2000 Piece
包装细节:
Standard export package
交货时间:
Within 20 days
供应能力:
10000 Piece per Day
付款方式:
T/T, L/C, D/P, Western Union
联系人 Ms. Yamin
No.46 Renmin East Road, Changsha, Hunan
PRODUCT NAME:METAL PLANK
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.
Size (mm) |
Weight (kg/pc) |
Size (mm) |
Weight (kg/pc) |
WALK BOARDS |
CATWALK |
||
**0 x *5 x 1.2 x ***0 |
*3.*0 |
**0 x *0 x 1.2 x ***9 |
*5.*0 |
**0 x *5 x 1.2 x ***0 |
*0.*6 |
**0 x *5 x 1.2 x ***9 |
*3.*0 |
**0 x *5 x 1.2 x ***0 |
6.*3 |
**0 x *5 x 1.2 x ***9 |
*3.*0 |
**0 x *5 x 1.2 x ***0 |
3.*9 |
**0 x *8 x 1.2 x ***9 |
*2.*0 |
**0 x *5 x 1.2 x ***0 |
*4.*7 |
**0 x *5 x 1.2 x ***9 |
*2.*0 |
**0 x *5 x 1.2 x ***0 |
*1.*3 |
**0 x *0 x 1.2 x ***9 |
*1.*0 |
**0 x *5 x 1.2 x ***0 |
7.*9 |
**0 x *5 x 1.2 x ***9 |
*0.*0 |
**0 x *5 x 1.2 x ***0 |
3.*4 |
**0 x *5 x 1.2 x ***9 |
9.*0 |
**0 x *0 x 1.2 x ***0 |
*5.*7 |
**0 x *8 x 1.2 x ***9 |
9.*0 |
**0 x *0 x 1.2 x ***0 |
*1.*4 |
**0 x *5 x 1.2 x ***9 |
9.*0 |
**0 x *0 x 1.2 x ***0 |
8.*0 |
**0 x *0 x 1.2 x ***9 |
*1.*0 |
**0 x *0 x 1.2 x ***0 |
4.*5 |
**0 x *0 x 1.2 x ***9 |
8.*0 |