离岸价格
获取最新报价16 ~ 250 / Set ( Negotiable )
|Minimum Order
位置:
China
最小订单价格:
最小订单:
1 Set
包装细节:
wooden case
交货时间:
5-30 days
供应能力:
1000 Set per Month
付款方式:
T/T, L/C, Western Union, PayPal
联系人 Ms. liu
mengjin road 66,shangjie district, Zhengzhou, Henan
1. Closure rubber check valve introduction:
Closure rubber check valve is a new water supply and drainage valve with full rubber structure, duck-mouthed appearance and functions of positive flow-in and reserve cut-off. According to thrust analysis and calculation as well as different operation conditions, it is manufactured with different design mechanism and different rubber products by special processing, At positive operation the water flow inform entrance and the valve will be open at weak hydraulic pressure. the hydraulic pressure is higher .the valve gate will open more greatly and the water flow is greater ,At reserve operation, the valve gate closes naturally and seals tightly cut-off valve, the back pressure is higher, the valve gate closes more tightly and the seal effect is better. It is used widely in various drainage exits to prevent from pouring backwards and flowing backwards in city planning, water conservancy and sewage disposal etc, it is the ideal product to replace flap valve.
2. Closure rubber check valvecharacteristics:
The advantages is specially marked in comparison with traditional flap valve :
a) Open and close automatically in security and reliability according to hydraulic difference without noise and in no need of operator and maintenance.
b) Positive start has little water resistance and start-up pressure and the flow can be adjusted naturally according to hydraulic pressure.
c) Reserve cut-off has good seal without leakage to prevent from flowing backwards. the back pressure is higher and the effect is barrier.
d) Anticorrosion, aging resistance, deformation resistance, strong adaptability and long use life
e) Wide size scope, nominal diameter of DN**-DN***0.
3. Closure rubber check valve application:
1)sewage system
2)dishcarge system
3)dyke discharge
4)drainage of airport and freeway
5)sewer discharge
6)sewage lagoon discharge
7)smell separetion
4. Closure rubber check valve installation structure type
1) Belled XF-T be installed at the exit of drainage pipe
2) Flanged XF-T be installed at the exit end with flange of drainage pipe
3) Mounting plate XF-F be installed on the building at the water exit end.
4) Build-in XF-F be installed at the exit end of rain and sewage system in cities.
5) Grout or cement pipe XF-T be installed at the end of grout or cement pipe.