Drawing description paving contruction steps:
1.We suggest to adopt professional adhesives and joint filler,and
parts of our products
adopt neutral adhesives(see interior instruction)
2.Use special ash knife to sweep **3mm thickness adhesive after
cleaning to pavement surface
3.Use dentation trowel carve to score out waviness on the flat
mushy adhesive.
4.Paving mosaic pay attention to align the joints between mosaics
with the joints between
the product network adhibits.
5.Tenderly pat the surface of the mosaic and leveling treatment to
make sure it is adhesive
evenly.
6.About *0 hours later when mosaic is totally adhesive,use the
special sponge knife to fill
the joint fillers in the gaps.(soft tools to prevent damaging
prodcut surfact)
7.After *0 minutes,when the joint filler is semi-dry,use wet higt
density sponge to fill
into joint about **2mm.
8.Use dry towel to clean and finish the construction finally.