看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 立即加入 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
corrugated roof panel roll forming machine

corrugated roof panel roll forming machine

离岸价格

获取最新报价

|

Minimum Order

位置:

Bo tou

最小订单价格:

-

最小订单:

1 Piece

包装细节:

-

交货时间:

-

供应能力:

1 Piece per Day

付款方式:

T/T

现在联系
免费会员

联系人 jim

Botou city yuhua road, Cangzhou, Hebei

现在联系

详情

 The equipment includes:
Main forming machine, Hydraulic cutter , Electrical control system,Hydraulic system
4. Technical specifications and details
Main forming machine
Number of forming steps: ****2 stations
Material of shaft: *5# steel hardening and tempering treatment. Outer diameter *0mm  
Material of rollers: *5# steel Plated hard Chrome  
Main motor power: 4 kw
The forming speed: ***0m/min
The plating chromium’s thickness on the surface of rollers: 0.*5mm
Material width: ***0mm  Thickness of the steel: 0.**0.7 mm
Effective width after forming: ***4mm
Chains:1 inch
Main stand:**0# H steel  Wall plate thickness:*4mm 
Dimension of the machine: 6mx1.5mx1.2m
Weight of the machine: ***0kg
Hydraulic cutter
Material of blade: Cr*2 mould steel with quenched treatment ****2
Cutting system: adopt advanced hydraulic drive, automatically cutting after forming, no distort, no wasting, high safe factor.
The electrical control system (with transducer)
Display: textscr Delta PLC with transducer(keep tolerance within±2mm)
•  Encoder:                “Rui pu”  or  “xin ya”  (Wu xi)
•  frequency converter:     “sanjing”   (Guang zhou )
•  Controlling screen :        liquid crystal display(Text Panel)
•  electric relay           :      Delixi Jqx**3F2Z
•  circuit breaker         :      Delixi
Hydraulic system
Adopting advanced hydraulic system
Power: 3 KW
5. The total price of the equipment:
6. Payment: *0% T/T prepaid, and pay *0% before shipping and after inspection in our workshop.
7. Delivery time: *0 working days.
8. Guarantee period: one year.
9. Installation and training:
① When the buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
② Our technician can go to your local factory to install,please arrange board and lodging and other necessary things.
*0. Spare parts:
bearings,  buttons,  chains, magnetic  valve,  protective tube
 

Send a direct inquiry to this supplier

至:

jim < Kinberly industry Co., ltd >

我想知道: