1,Introduction Geomembrane connection lock is connected to
the film developed and concrete is extruded hdpe strip products, e
or t-shaped in cross-section is suitable firmly anchored in
concrete. 2,Feature (1)
geomembrane connection lock is a flexible waterproof material, with
high seepage coefficient. (2)
having good heat resistance and cold resistance, the temperature of
the environment of high temperature **0 o C, low temperature
**0 (3) has
good chemical stability, resistant to acid, alkali, oil, corrosion
is good anti-corrosion materials. (4) has
a very high tensile strength, it has a high tensile strength to
meet the high standards of project needs (5) has
a strong weather resistance, has a strong anti-aging properties,
and prolonged use can maintain the original
performance (6) has
a strong tensile strength and elongation at break, so HDPE
geomembrane can be used in a variety of harsh geological and
climatic conditions. Strong adaptability to adapt to uneven
settlement. (7)
excellent UV stability 3,Application (1)
Environmental protection, sanitation (such as landfills, sewage
treatment plants, power conditioning tank, industrial, hospital
solid waste treatment plant slope) (2)
Hydraulic Engineering (reservoir dam seepage, consolidation,
vertical heart wall, slope protection) (3)
Municipal Engineering (subway, underground engineering buildings,
sewers lining) (4)
Garden (artificial lakes, rivers, reservoirs, golf course pond
slope) (5)
Petrochemical (tank seepage, chemical reaction tanks, sedimentation
tanks lined chemical plants, oil refineries, gas
stations) (6)Mining (washing pool, heap leaching pool,
the ash field, dissolving tanks, sedimentation tanks, tailings
seepage slope) (7)Mining (washing pool, heap leaching pool,
the ash field, dissolving tanks, sedimentation tanks, tailings
seepage slope) (8)
Transport facilities (foundation reinforcement, subway, highway
culvert seepage). 4, Installation
Instructions E or
T-lock installed in a position reserved for a period of recess when
pouring concrete, to be impervious construction of the E or T-type
lock embedded in the groove, and pouring concrete forming again,
lock that is fixed on the surfaces of buildings,Laying of HDPE
geomembrane extrusion welding and E-lock connection.