离岸价格
获取最新报价|
Minimum Order
位置:
China
最小订单价格:
-
最小订单:
-
包装细节:
-
交货时间:
-
供应能力:
-
付款方式:
T/T, L/C
联系人 Mr. Nick
F-3 of building #, West District of Science & Technology Pioneer Park, NO 211 Yanbei Road , Haiy, Jiaxing, Zhejiang
Considering the dangerous situation the pipeline suffered, we manufacture and test it in accordance with the following principle strictly to ensure the usability responsibly:
****-ASME B*1.3
****-ASME Ⅸ
****-API 6A
****-NACE MR ***5
Also, to get the client’s acknowledge, all the client have the right to inspection in the key procedure besides our autonomic test which include UT, MT, RT and hydrostatic leak test to all the components. For the rigorous examination we used to control the quality, the market response is very good.