看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 立即加入 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
MFT-2 door gasket welder

MFT-2 door gasket welder

离岸价格

获取最新报价

|

Minimum Order

位置:

-

最小订单价格:

-

最小订单:

-

包装细节:

-

交货时间:

-

供应能力:

-

付款方式:

-

现在联系
免费会员

联系人 Mr. Yuanjun

tianyuan road, Hefei, Anhui

现在联系

详情

Product Name:MFT*2 door gasket welder
Product Description:

  

1.        MFT*2 door gasket welder is used for the refrigerator door gasket. Freezer. Disinfecting cabinet door gasket, and other special equipment for welding, it is designed basis on Germany welder and development of stereotyped after the upgrading of products in the domestic door gasket welding machine. The field is advanced equipment.

2.        MFT*2 door gasket welder for the single angle of welding equipment, heating system using a smart silicon control regulator, replacing the regulator to ensure the accuracy of welding temperature and stability. Heater is made of a foreign custom-made materials

3.        The equipment weld an angle, the cycle is about *6 seconds, up to the efficiency of production operation proficient ******0 sets / shift.

4.        Maintenance and repairs: The equipment in a long time at high temperature. High frequency. Impact, such as poor working environment, so the parts. Lubrication of the sliding surface is utmost importance, before each class in each part should be carefully carried out on the refueling lubrication to ensure normal operation of equipment

5.        Regular inspection of the oil-triple, to ensure that the cylinder. Electromagnetic valve lubrication well, to prevent the various components of non-oil work

6.        Welding die in a long time to work under high temperature, prone to blunt mould edge change, propose mill the knife edge of die in the use of a year.

7.        Regularly checked equipment to ensure that the precision of left and right tooling, adjust the slider screw tightness at the bottom of the left and right tooling to keep horizontal block gap between the heater and  left & right tooling , adjusting the gap right then tightening the fastening screws.

8.        For the replacement of heating pipe, they should cut off power, to be cooling down the heating block before  replacement of electric heating to prevent scald

9.        Technical Specification:

1)        Dimension:ˇˇˇˇˇˇˇˇˇˇˇˇ..***0x***0X***0

2)        Latitude die Stroke:ˇˇˇˇˇ ˇˇˇˇ****0mm

3)        Electric Heating Device Stroke:ˇˇˇˇˇ*8mm

4)        Main Power:ˇˇˇˇˇˇˇˇˇˇˇˇ2.0KW

5)        Heating Power:ˇˇ  ˇ ˇˇˇˇˇˇˇ1.2KW

6)        Working Cycle:ˇˇˇˇˇˇˇˇˇˇˇ*6s/single angle

7)        Working Capacity:ˇˇˇˇˇˇˇˇˇˇ******0frames/shift

8)        Heating Specˇˇˇˇˇˇˇˇ.        .┆*6】*3  **0V **0W

9)        Gross Weight:ˇˇˇˇˇˇˇˇˇˇˇ ˇ **8KG

 

Send a direct inquiry to this supplier

至:

Mr. Yuanjun < Hefei Hefa Trading Co., Ltd >

我想知道: