离岸价格
获取最新报价|
Minimum Order
位置:
-
最小订单价格:
-
最小订单:
1 Set
包装细节:
packed in 40HQ By backhoe loader
交货时间:
15-20 days after confirm the order
供应能力:
-
付款方式:
T/T, L/C, Western Union
联系人 Mr. Shawn
A1402 Kaiyuan shangcheng linyi shandong, Linyi, Shandong
***0kg | |
***0****8****0mm | |
***0mm | |
**0mm | |
1.0m³ | |
*8kn | |
***0kg | |
***2mm | |
***2mm | |
*2mm | |
0.3m³ | |
***2mm | |
**0℃ | |
*9kn | |
YTR***8G***1 | |
In line direct injection four-stroke and injection combustion chamber | |
****8***0 | |
*5kw | |
***0r/mm | |
≤**6/km.h | |
≥**1.7N.M/***0r/min | |
4.4L | |
BZZ***0 | |
±*6℃ | |
***8mm | |
*2Mpa | |
Fei Cheng Axle Factory | |
Double reduction | |
YJ**0 | |
Single-stage three elements | |
*4.*0% | |
0.4Mpa*0.*5Mpa | |
1.2Mpa*1.5Mpa | |
Oil-cooling pressure circulation | |
Fixed shaft power transmission | |
***3Kpa****9Kpa | |
Two gears ahead, two gears reverse . | |
*2km/h | |
*6/****0 | |
0.*2Mpa | |
0.*2Mpa | |
Air over oil caliper brake | |
self-regulation | |
Emergency brake | Manual operation power terminating brake |
*6.5kn | |
*1kn | |
5.4s | |
3.1s | |
2.0s |