Performance Data of Technology 1. Production line Dimensions
(Reference): About L****0*W***0*H***0; 2. Height for work piece:
from ground **0mm; 3. Stations: 8; 4. The work of the beat: *5
seconds / set; 5. Process is as follows: Automatic loading→punching
→*0 degree bending machine→ big R bending machine→convey and
position machine→two end side bending machine→Hole Flanging Machine
(for the rectangular hole of handle) →unload machine. 6. Work piece
materials used: Pre Paint Sheet Steel (with film) Panel thickness:
0.***0.*5mm; 7. Dimension after Form: Length*Width
(**0~***0mm)*(**5mm: adjusting this dimension by changing two end
side bending mould); 8. Electric supply: AC**0V, *0HZ, the total
power of about *5KW; 9. Gas source: 1 / 2 "(0.**0.*5Mpa); *0. Water
supply: Industrial water. (*5 liters/minute)