离岸价格
获取最新报价2000 ~ 10000 / Set ( Negotiable )
|Minimum Order
位置:
-
最小订单价格:
最小订单:
1 Set
包装细节:
crate packing
交货时间:
50 days
供应能力:
50 Set per Month
付款方式:
T/T, L/C, D/A, D/P, Western Union, PayPal
联系人 kayla
Ningbo, Zhejiang
Mould steel | NAK*0, S**6, **8H, SKD*1 etc |
Plastic material | PP, PS, PE, PET, TPR, PVC, PA, POM, ABS, PC PPR etc. |
Mould base | LKM, ML, HASCO etc. |
Hot runner system | YUDO, D-M-E, moldmaster etc. (customer demand) |
Normalize parts | D-M-E, HASCO, JIS etc. (customer demand) |
Software | CAD/CAM/CAE |
No. of cavity | Single/Multi |
Min mould life | **0,**0 to 1,**0,**0 cycles |
Lead time | 4weeks*2 months |
Process | CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc. |
Packing | Crate packing |