We can design the production
line according to your requirements. The following data is just for
your reference.
1. Brief Introduction
Capacity: 1,130 ton/year
Output capacity: 157kg/h
Finished effective width: 2,000mm Thickness:
0.38mm
Based on 24 hour/days, 3 shifts, 300
days/year.
It needs about 4 workers each shift,12 workers 3 shifts to
finish the work.
2. Procedure:
1.High torque twin screw extruder(use for extruder the plastic material)
2.Hydraulic and quick net changer (use for filter material content of impurities)
3. Melt Pump
4.Sheet extrusion die
5. Flat type three-roll calendar
6. Separate type roller temperature equipment
7. Sheet slow cooling equipment
8. Scrap edge device
9. Sheet traction part
10.Wrap-up device
11.PLC computer control
(control all the machines)