看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。
点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
SGS Waste Water Treatment Line

SGS Waste Water Treatment Line

离岸价格

获取最新报价

( Negotiable )

|

Minimum Order

位置:

-

最小订单价格:

-

最小订单:

1

包装细节:

-

交货时间:

-

供应能力:

-

付款方式:

T/T, L/C, D/P, Western Union

现在联系
免费会员

联系人 Mr. Chen

No.12 Huanghe Road, Changshu, Jiangsu

现在联系

详情

1.Project Overview
1.1 Project overview
The factory is located in xxx,wastewater mainly comes from the following zones: xxx and xxx
Main adoptive wastewater treatment technology:
(1) Air Floatation 
(2) Membrane Bioreactor (MBR)
(3) Reverse Osmosis (RO)
This System insures treated water standard, automatic PLC control, easy operation and maintenance.
 
1.2 Wastewater 
1.2.1 Wastewater source:
(1) Degreasing wastewater is *5 m3 per month;
·degreasing tank; the main chemical component is sodium hydroxide, pH=9.***1.0,volume is **0 liters,solution change is 4 times per month .solution temperature is *0 ºC.
·tap water rinsing tank *2pcs; volume is **0 liters each, solution change is 4 times per month, tank rinsing is 4 times per month, volume of rinsing water is ***0 liters per month.
(2) Iron series phosphating wastewater is *7 m3 per month .
·iron phosphating tank; the main chemical component is orthophosphoric acid( the agent is Granodine ***0,the manufacturer is "Henkel"), pH is 4.**5.6, volume is ***0 liters, solution change is once per month ,tank rinsing is once per month ,volume of rinsing water is ***0 liters, solution temperature is ****5ºC.
·tap water rinsing tank*1pc; volume is ***0 liters, water change is 4 times per month, tank rinsing is once per month, volume of rinsing water is ***0 liters.

2.Project Design

  1. Design basis
        2.1.1 Design water standard

2.2 Design principle

(1)Environmental Protection Act(Russian)(January *0, ***2);
(2)Nature Conservation Act of Russian SFSR;
(3)Administrative Laws and Regulations of Barnaul NO.***7( August *0, ***0);
(4)other documents delivered by customer.


3. Process Flow
3.1 Process flow
Based on the technological process in the 2 production zones and chemical analysis of wastewater, wastewater treatment process (WWTP) of Air Floatation combined with Membrane Bioreactor (MBR) and Reverse Osmosis (RO) is selected. 

Send a direct inquiry to this supplier

至:

Mr. Chen < Suzhou CMT Engineering Company Limited >

我想知道: