We offer up to ***0 MT/Month of copper ore ****0%
Price Structure indexed to London Metal Exchange.
Payment: **0% at loading Port in Mexico. Method #1:
A.) *0% when material arrives to loading port with
analysis from mine.
B.) *5% with approved analysis and certification of
product at the loading port.
C.) *0% final payment with all shipping documents and
certifications
Method#2:
A.) Transferrable Documentary Letter of Credit
payable **0% FOB Mexico Loading Port.