离岸价格
获取最新报价280 ~ 450 / Ton
|Minimum Order
位置:
-
最小订单价格:
最小订单:
5 Ton
包装细节:
in bundle or as your request
交货时间:
10 to 25 days
供应能力:
100 Ton per Day
付款方式:
T/T, L/C, D/P
联系人 Ms. Maggie
NO.9 Xiangfu Middle Road, Changsha, Hunan
galvanized scaffolding pipe Outside diameter (mm) |
galvanized scaffolding pipe Wall thickness (mm) |
galvanized scaffolding pipe Length (m) |
*8.***8.6 | 2.**2.5 | 0.***2 |
*8.***8.6 | 2.*5 | 0.***2 |
*8.***8.6 | 3.0 | 0.***2 |
*8.***8.6 | 3.*5 | 0.***2 |
*8.***8.6 | 3.5 | 0.***2 |
*8.***8.6 | 3.*5 | 0.***2 |
*8.***8.6 | 4.0 | 0.***2 |