看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
plastic Racetrack  /  plastic Running track

plastic Racetrack / plastic Running track

离岸价格

获取最新报价

10 ~ 20 / Square Meter ( Negotiable )

|

Minimum Order

位置:

-

最小订单价格:

最小订单:

500 Square Meter

包装细节:

Woven bag, Steel barrel

交货时间:

5~10 days

供应能力:

-

付款方式:

T/T, L/C, Western Union

现在联系
免费会员

联系人 Mr. Alex

No.52 Harbin Road, Qingdao, Shandong

现在联系

详情

.
Running Track / Athletic Track
image
SPRAY COAT running track
 
Construction process:  1st, use paver machine to flat rubber & PU glue mixture, then get the BASE LAYER; 2nd, use spraying machine to spread EPDM granule & PU mixture on to base layer, this is called FACE LAYER.   
 
SPRAY COAT model is good cost.
 
SANDWICH running track
 
Construction process:  1st, use paver machine to flat rubber & PU glue mixture, then get the BASE LAYER; 2nd, pour PU & EPDM granule mixture onto base layer, the mixture is mainly PU glue..
 
SANDWICH model is mainly used in club and other business fields.
 
FULL POUR running track
 
Construction process:  1st, pour PU glue & EPDM granule onto basement directly.  The mixture is mainly PU glue.
 
FULL POUR model is the highest level choice, it is mainly used for professional fields.

image


image

Send a direct inquiry to this supplier

至:

Mr. Alex < SinoFlooring Company Limited >

我想知道: