看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Manufacturer Directory Aluminum Constructionconcrete Plank

Manufacturer Directory Aluminum Constructionconcrete Plank

离岸价格

获取最新报价

700 ~ 800 / Ton ( Negotiable )

|

Minimum Order

位置:

-

最小订单价格:

最小订单:

1 Set

包装细节:

BULK PACKING THEN PALLET PACKED

交货时间:

30DAYS AFTER PAYMENT

供应能力:

200 Ton per Month

付款方式:

T/T, L/C, D/A, D/P, Western Union, PayPal

现在联系
免费会员

联系人 Ms. zhu

wuyun road, Wuxi, Jiangsu

现在联系

详情

steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements

 

1) A larger capacity

When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).

 

2) Easy disassembly, erection and flexible

Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

 

3) To compare the economy

Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.

 

 

 

Send a direct inquiry to this supplier

至:

Ms. zhu < WUXI HANJIE TRADE CO., LTD >

我想知道: