离岸价格
获取最新报价700 ~ 800 / Ton ( Negotiable )
|Minimum Order
位置:
-
最小订单价格:
最小订单:
1 Set
包装细节:
BULK PACKING THEN PALLET PACKED
交货时间:
30DAYS AFTER PAYMENT
供应能力:
200 Ton per Month
付款方式:
T/T, L/C, D/A, D/P, Western Union, PayPal
联系人 Ms. zhu
wuyun road, Wuxi, Jiangsu
steel plank can replace timber or bamboo plank, construction workers can walk on that.There
are many different sizes and materials of the steel plank, we can make that products according
to the customer's requirements
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.
PRODUCT TYPES