Introduction
of Aluminum Template System Material:****-T6
****-T6 Bearing
capacity:*0KN/m2 Weight:****0kg/m2 Hardness:about
*3webster Color:silver
white Surface: coated by
isolation layer Four Major
Aluminum Template Systems Template
System: To constitute
the closed surface desired for concrete structure construction and
ensure the forming of construction structure in concrete
pouring. Accessory
System: To connect
single pieces of templates into a whole system, as connecting
template member. Support
System: To play a
supporting role in the process of concrete structure construction
and ensure floors, beam bottoms and cantilevered structures to be
held steadily. Fastening
System: To guarantee
the width dimensions of structured formed by templates and ensure
no template deformation, expansion or explosion in the process of
concrete pouring.
Products
details 1. total
system forms the complete concrete structure 2.
convenient 3. easy
operation 4. high
quality 5. light and
great flexibitity 6. durable,
made of special alloy aluminum 7. no need for
rehabilitation, no risk of rust and corrosion 8. fast
installation owing to its special design 9. speed of
construction**-days each floor construction
cycle. *0. Formwork
can be re-used over **0 times. *1. No tower
cranes required to lift the formwork from floor to floor, as the
formwork is lightweight.
System
Characteristics System
Characteristicshigh standardization, lightweight, strong bearing
capacity, high matching accuracy, disassembly convenience, large
plate surface, less joints, good stability, long service life, more
circulation times, recyclability, good economic benefits and high
recovery value.
Analysis on
Standard Five-day Construction Period 1) Day
1:Measure, lay off, bundle wall rebars and complete water and
electricity performing and embedding 2) *7:****2:*0
in Day 2:Remove wall boards of lower level and transfer to the
upper level for installation of wall column
template 3) *4:*0 in
Day 2 - *8:*0 in Day 3:Remove wall boards of lower level and
transfer to the upper level for installation 4) *7:****5:*0
in Day 4:Bundle beam rebars, erect cantilevered structures for
template construction, and adjust and strengthen wall column
templates 5) *5:*0 in
Day 4 - *5:*0 in Day 5:Bundle floor slab rebars and alternate water
and electricity performing and embedding 6) *5:****7:*0
in Day 5:Clean the floor, recheck dimensions and prepare for
concrete pouring 7) *7:****3:*0
in Day 5:Concrete pouring
Our
Service • Your inquiry
related to our product & price will be replied within
*4hours.
• Well-trained
& experienced staff are to answer all your inquiries
professional in English of course.
• Working
time: 8:30am
-6:*0pm,
Monday to Friday.
• OEM is
highly welcomed. We have strong R&D team here to
help.