Introduction of Aluminum Template
System Material:****-T6
****-T6 Bearing capacity:*0KN/m2 Weight:****0kg/m2 Hardness:about *3webster Color:silver white Surface: coated by isolation
layer
Four Major Aluminum Template
Systems Template System: To constitute the closed surface desired for
concrete structure construction and ensure the forming of
construction structure in concrete pouring. Accessory System: To connect single pieces of templates into a
whole system, as connecting template member. Support System: To play a supporting role in the process of
concrete structure construction and ensure floors, beam bottoms and
cantilevered structures to be held steadily. Fastening System: To guarantee the width dimensions of
structured formed by templates and ensure no template deformation,
expansion or explosion in the process of concrete
pouring.
System
Characteristics System Characteristicshigh standardization,
lightweight, strong bearing capacity, high matching accuracy,
disassembly convenience, large plate surface, less joints, good
stability, long service life, more circulation times,
recyclability, good economic benefits and high recovery
value.
Major Advantages 1.Short Construction
Period Quick release system. the normal construction of
one storey can be completed in three to four days, which greatly
cuts down the contractors management
cost. 2.Multiple Reuse and Low Average Use
Cost Raw materials:****-T6 and ****-T6,
processed into various dimensions and specifications required for
projects. one aluminum alloy construction template system is
reusable for ******0 times or so, with low average use
cost. 3.Convenient and Highly Efficient
Construction Simple and convenient to assemble, with the
average weight of *5KG/m, completely by labor, it is OK for
construction staffs to receive simple training before installation,
with no technicians required. 4.Good Stability and High Bearing
Capacity Once assembled, the system will be an integrated
framework, good in stability and reasonable in bearing column
arrangement, with the bearing capacity reaching
*0KN/m3. 5.Wide Application Scope and High Recovery
Value Widely applied to positions like walls, columns,
beams, floor slabs, stairs, windows and bay window plates. If
scrapped, have high residual value for disposal 6.Concrete Surface Effect after Template
Removal After concrete pouring and removed the template,
the concrete surface is clean and smooth with no need of plastering
then saved cost for plastering . 7.Convenient Management on the
Site After assembly and disassembly of
aluminum alloy templates, there will be no rubbish on the site at
all and the construction environment will be safe, clean and
neat. 8.Standard, Strong Universality, Low
Carbon, Emission Reduction Different sizes and specifications
are available. When used templates are
applied to new construction projects, it is merely required to
replace about *0% non-standard materials, eco-friendliness, low
carbon and emission reduction of construction
projects. 9.Convenient Support
System In the traditional wood template
construction method, full framing is universally applied to floor
slab and platform construction techniques and will cost
considerable labor and materials, leaving no space for
operation.
Analysis on Standard Five-day Construction
Period 1) Day 1:Measure, lay off, bundle wall
rebars and complete water and electricity performing and
embedding 2) *7:****2:*0 in Day 2:Remove wall boards
of lower level and transfer to the upper level for installation of
wall column template 3) *4:*0 in Day 2 - *8:*0 in Day 3:Remove
wall boards of lower level and transfer to the upper level for
installation 4) *7:****5:*0 in Day 4:Bundle beam rebars,
erect cantilevered structures for template construction, and adjust
and strengthen wall column templates 5) *5:*0 in Day 4 - *5:*0 in Day 5:Bundle
floor slab rebars and alternate water and electricity performing
and embedding 6) *5:****7:*0 in Day 5:Clean the floor,
recheck dimensions and prepare for concrete
pouring 7) *7:****3:*0 in Day 5:Concrete
pouring
Our Service • Your inquiry related to our product &
price will be replied within *4hours.
• Well-trained & experienced staff are
to answer all your inquiries professional in English of
course.
• Working
time: 8:30am
-6:*0pm,
Monday to Friday.
• OEM is highly welcomed. We have strong
R&D team here to help.
• Your business relationship with us will be
confidential to any third party.
• Good after-sale service offered, please
get back if you got question