看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Aluminum alloy construction template

Aluminum alloy construction template

离岸价格

获取最新报价

150 ~ 250 / Square Meter

|

Minimum Order

位置:

-

最小订单价格:

最小订单:

2000 Square Meter

包装细节:

as custormer's request

交货时间:

-

供应能力:

-

付款方式:

T/T, L/C

现在联系
免费会员

联系人 Ms. Bella

Shijiazhuang, Hebei

现在联系

详情

Introduction of Aluminum Template System
Material ****-T6  ****-T6
Bearing capacity:*0KN/m2
Weight:****0kg/m2
Hardness:about *3webster
Color:silver white
Surface: coated by isolation layer

Four Major Aluminum Template Systems
Template System:
To constitute the closed surface desired for concrete structure construction and ensure the forming of construction structure in concrete pouring.
Accessory System:
To connect single pieces of templates into a whole system, as connecting template member.
Support System:
To play a supporting role in the process of concrete structure construction and ensure floors, beam bottoms and cantilevered structures to be held steadily.
Fastening System:
To guarantee the width dimensions of structured formed by templates and ensure no template deformation, expansion or explosion in the process of concrete pouring.

Products details
1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum
7. no need for rehabilitation, no risk of rust and corrosion
8. fast installation owing to its special design
9. speed of construction**-days each floor construction cycle.
*0. Formwork can be re-used over **0 times.
*1. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.

System Characteristics
System Characteristicshigh standardization, lightweight, strong bearing capacity, high matching accuracy, disassembly convenience, large plate surface, less joints, good stability, long service life, more circulation times, recyclability, good economic benefits and high recovery value. 

Analysis on Standard Five-day Construction Period
1) Day 1:Measure, lay off, bundle wall rebars and complete water and electricity performing and embedding
2) *7:****2:*0 in Day 2:Remove wall boards of lower level and transfer to the upper level for installation of wall column template
3) *4:*0 in Day 2 - *8:*0 in Day 3:Remove wall boards of lower level and transfer to the upper level for installation
4) *7:****5:*0 in Day 4:Bundle beam rebars, erect cantilevered structures for template construction, and adjust and strengthen wall column templates
5) *5:*0 in Day 4 - *5:*0 in Day 5:Bundle floor slab rebars and alternate water and electricity performing and embedding
6) *5:****7:*0 in Day 5:Clean the floor, recheck dimensions and prepare for concrete pouring
7) *7:****3:*0 in Day 5:Concrete pouring

Our Service
• Your inquiry related to our product & price will be replied within *4hours.
 
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
 
• Working time: 8:30am - 6:*0pm, Monday to Friday.
 
• OEM is highly welcomed. We have strong R&D team here to help.
 
• Your business relationship with us will be confidential to any third party.
 
• Good after-sale service offered, please get back if you got question
 

Send a direct inquiry to this supplier

至:

Ms. Bella < Hebei Byang Hardware Co.,LTD >

我想知道: