离岸价格
获取最新报价2.68 ~ 3 / Piece ( Negotiable )
|Minimum Order
位置:
china
最小订单价格:
最小订单:
10 Piece
包装细节:
wooden pallet
交货时间:
within 15 days
供应能力:
100000 Piece per Month
付款方式:
T/T, L/C, Western Union, Money Gram, PayPal
联系人 Mr. JKack
huifeng road, da wan town, gaoyao, Zhaoqing, Guangdong
Sunstone roof tiles offer your following :
PRODUCTION
Our production facility is one of the most sophisticated in the world. The teamwork between our technical and production groups has resulted in many automated systems. These systems are not just responsible for production speed, they also ensure the consistent quality of our finished goods.
Producing a coated metal tile involves four basic steps.
1. metal forming
2. coating
3. curing
4. warehousing
Large coils of Zinc-Aluminium steel are shipped into the factory. The coils are cut and formed into roof tiles and accessories.
The newly formed pieces are sent from the metal department to the coating department. Here they are coated with either high-grade roof paint, or coated in basecoat and covered in stone chips.
The newly coated pieces are then transferred to large ovens where they are baked until the coatings are fully cured and stable.
All the cured parts and pieces are then palletized, wrapped, labeled and prepared for shipping.
We employ full time professionals whose sole responsibility is testing and auditing our production process and materials. Adherence to strict guidelines maintains our foremost level of quality.