看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
DaJaBaRa Scale Collector

DaJaBaRa Scale Collector

离岸价格

获取最新报价

|

Minimum Order

位置:

-

最小订单价格:

-

最小订单:

1

包装细节:

Standard wooden packaging

交货时间:

15 to 20 days

供应能力:

30 Acre per Day

付款方式:

-

现在联系

KMX Co.,Ltd.

South Korea

免费会员

联系人 Mr. MinSoo

Dong-gu, Daejeon

现在联系

详情

A DaJaBaRa Scale Collector

image


image

A. Cooling Water Cleaning System

  • It removes the scale which is fixed to the equipment of the cooling water system by using the principle of electrolytic method. (Removes solid scales by using " Electrolytic Technology")
  • This is Cooling Water Cleaning System which prevents scales from being generated at Cooling tower filter, circulation piping, Evacon tube, etc, (Prevents re-gaining Scales on Pipes, Filter, Tubes etc)
  • It removes the scale which is fixed in cooling towers and heat exchangers while preserving water quality and atmosphere. (Saving and improving the quality of water while it removes scale)
  • It kills bacteria and microorganisms such as legionella and salmonella in cooling water, and removes green algea. (Reduces Bacteria and microorganisms (i.e as legionella and salmonel) and  removes green algae)
  • Using environmentally friendly products (DaJaBaRa), which has caused water pollution and environmental pollution by using existing high-risk chemicals. It excelled in environmental protection and energy saving after installation. (Eco-Friendly by reduces using chemicals)

B. Installation Location
  • CW Supply piping between cooling tower and heat exchanger

C. Processing Capacity (RT : Ton of Refrigeration)
  • The processing capacity per unit of cooling water cleaning system should be greater than the replenishing volume of the cooling tower.
  • In the  case of 500RT, the circulation volume of the cooling water is 390ton/hr, so 390ton/hr x 0.012=4.68ton/hr (replenishment amount of the cooling tower).
  • The standard processing capacity per unit of 500RT is 5.0ton/hr and this is greater than 4.68ton/hr which is the replenishment amount of the cooling tower and so, install 1 unit of 500RT.

D. DaJaBaRa Installation Effect
1. Arresting Ca²+ (calcium ion), Mg²+(magnesium ion), such as scale generating ions dissolved in
   water onto cathode surface
   - Maintaining the concentration to below the solubility
   - Preventing scale generation
2. Inhibits generation of microorganisms productioin by radical bydroxyl and chlorine
   - Inhibiting Slime
   - Inhibiting green algae
   ※ Radical hydroxyl group : Strong chemicals for oxidizing with non-toxic character froim the
      known substances (fluorine, ozone, chlorine)
3. Anti-Corrosion
   - Prevents corrosion by changing cooling water into alkaescent water
 
  • Installation Overview
           Installation Location
             •Install in cooling tower and CW supply pipeline


image
  • Electrolysis Chemical Process
- Water flows between the anode (+) and the cathode (-) through the electrolytic water bath. 
   In this process, basic Ph is formed on the cathode surface and acidic Ph is formed on the anode surface.

- Separation and removal of precipitates such as CaCo2, MgCO3 through chemical reaction on the cathode surface.
  •Ca(HCO₃)₂+20Hˉ→ CaCO₃ ↓ + 2H₂O + CO₂ˉ²
  •Mg(HCO₃)₂→MgCo₃ ↓ + 2H₂O + CO₂¯²
 
-Trough the chemical reaction of the surface of the anode, it changes the part of the chloride into a small amount active
   chlorine and acts as a sterilizer.
  •HOˉ- e OH°(Radical ), CIˉ→ CI°(Radical chlorine), 2CI°→CI₂ (Chlorine molecule)

 
  • Product Specification
imageimage





KMX Co., Ltd.


 

Send a direct inquiry to this supplier

至:

Mr. MinSoo < KMX Co.,Ltd. >

我想知道: