离岸价格
获取最新报价( Negotiable )
|Minimum Order
位置:
-
最小订单价格:
-
最小订单:
1 Set
包装细节:
wooden package
交货时间:
15 to 20 days
供应能力:
100 Set per Month
付款方式:
Western Union, L/C, T/T
联系人 Ms. Jinzhen
East Jinshui Road, Shanghai, Shanghai
.1. The overall layout is
compact, covers a small area. Only single storey layout is needed
for the boiler room, low cost on infrastructure construction,
convenient for transportation, and short installation period.
2. Using spirally corrugated tubes, strengthen the disturbance of flue gas, high heat transfer efficiency. 3. Reasonable design, safe and reliable operation, flat fire bed, and high thermal efficiency. 4. Complete auxiliaries, mechanized coaling and slag tapping, convenient operation. 5. Use chain grate, low coal leakage, good ventilation, wide adaptability of different coals. 6. The boiler shell use aluminium silicate board for heat preservation, low heat loss. 7. Equipped PLC full automatic intelligent control system, operate automatically. 8. Full automatic interlock protection program, has the protection function of water shortage, over pressure, over temperature, gas leakage, flame out, and electric leakage, etc. 9. By equipping with economizer, make full use of flue gas heat, increase the thermal efficiency |
Model Item |
DZL1 | DZL2 | DZL4 | DZL6 | DZL8 |
DZL10 (Assembly) |
DZL15 (Assembly) |
DZL20 (Assembly) |
|
Steam
Capacity (t/h) |
1 | 2 | 4 | 6 | 8 | 10 | 15 | 20 | |
Steam
Pressure (MPa) |
0.7/1.0/1.25 | 1.25/1.6 | |||||||
Steam
Temperature (℃) |
170/184/194 | 194/204 | |||||||
Feed water Temperature(℃) | 20 | 20 | 20 | 20 | 20 | 70 | 70 | 70 | |
Heating Area(m2) | Body | ~33 | ~50 | ~100 | ~170 | ~200 | ~250 | 316 | 502 |
Econom izer |
10.56/20.7 | 27.6 | 52.48/33.12 | 87.2 | 98 | 174 | 351 | 382 | |
Effective
Grate Area(m2) |
2.22 | 2.22 | 4.1 | 5.5 | 7.95 | 9.75 | 11.1 | 23.9 |