离岸价格
获取最新报价50 ~ 1000 / Piece ( Negotiable )
|Minimum Order
位置:
-
最小订单价格:
最小订单:
10 Piece
包装细节:
3-PLY WOOD PACKING BOX
交货时间:
45-50DAYS
供应能力:
10000 Piece per Year
付款方式:
T/T, L/C
联系人 MOON
Bangkok road, Jinan, Shandong
1.DESIGN&MANUFACTURE CONFORMS TO EN****9. | |||
2.FACE TO FACE COMFORMS TO EN****1. | |||
3.FLANGE CONFORMS TO EN****-B1. | |||
4.TEST CONFORMS TO EN******1. |
ITEM | PART NAME | MATERIALS | ITEM | PART NAME | MATERIALS |
1 | BODY | 1.***8 | *1 | HANDWHEEL | C.S |
2 | DISC | 1.***1 | *2 | SHIM | S.S |
3 | SPLIT RING | 1.***1 | *3 | NUT | A****8M |
4 | DISC SCREW | 1.***1 | *4 | LOCKING SCREW | S.S |
5 | STEM | 1.***1 | *5 | NUT | A****8M |
6 | GASKET | SS**6+GRAPHITE | *6 | SHIM | S.S |
7 | BONNET | 1.***8 | *7 | EYE BOLT | A***-B8M |
8 | PACKING | GRAPHITE | *8 | PIN | 2CR*3 |
9 | GLAND | 1.***8 | *9 | BOLT | A***-B8M |
*0 | YOKE NUT | COPPER ALLOY | *0 | NUT | A****8M |
DN | L | PN*6 | |||||||
D | D1 | D2 | B | f | N-φ | H | W | ||
*5 | **0 | *5 | *5 | *5 | *6 | 2 | ***4 | **0 | **0 |
*0 | **0 | **5 | *5 | *8 | *8 | 2 | ***4 | **0 | **0 |
*5 | **0 | **5 | *5 | *8 | *8 | 2 | ***4 | **5 | **0 |
*2 | **0 | **0 | **0 | *8 | *8 | 2 | ***8 | **5 | **0 |
*0 | **0 | **0 | **0 | *8 | *8 | 3 | ***8 | **0 | **0 |
*0 | **0 | **5 | **5 | **2 | *0 | 3 | ***8 | **0 | **0 |
*5 | **0 | **5 | **5 | **2 | *0 | 3 | ***8 | **5 | **0 |
*0 | **0 | **0 | **0 | **8 | *0 | 3 | ***8 | **0 | **0 |
**0 | **0 | **0 | **0 | **8 | *0 | 3 | ***8 | **0 | **0 |
**5 | **0 | **0 | **0 | **8 | *2 | 3 | ***8 | **0 | **0 |
**0 | **0 | **5 | **0 | **2 | *2 | 3 | ***2 | **0 | **0 |