1. Clean the surface of the substrate before use, remove the water,
dirt and other fixtures of the base area to be treated. If there
are cracks to be filled with putty or cement slurry, the surface of
the substrate should be smooth and solid, and there should be no
empty drum, loose and other phenomena.
2, before construction, slightly wet the surface of the substrate
for absorption.