离岸价格
获取最新报价( Negotiable )
|Minimum Order
位置:
-
最小订单价格:
-
最小订单:
1 Set
包装细节:
Wrapping Film Packing/Wooden Case
交货时间:
30 days after receiving your payment
供应能力:
10 Set per Month
付款方式:
T/T, L/C, D/P, Western Union, Money Gram, PayPal, Other
联系人 Mr. Gavin
No.511,yanling village, zhenglu town, wujin district,changzhou,jiangsu,china, Changzhou, Jiangsu
| Maintance: |
| 1. The suitable temperature is ****8 degree. It is good to install thermometer in your workshop. |
| 2. The machine can run *4 hours. For maintance, please stop the machine after half month. |
| 3. Please add mould oil on the mould every half month. |
| 4. Please clear and put anti-rust agent on the mould which is taked out from the machine. |
| 4. Please use good water for chiller, and put anti-rust powder sodium nitrite in the water. |
| 5. It needs **0 liters oil for hydraulic oil pump. Please filter the oil every year. |
| 6. It is good that there is one factory manager for machines. |
| After Sale Service: |
| 1. Upon arrival of the machines at your factory, we will send an engineer to install and test all machines |
| until qualified caps are produced. Engineer service is free in one week and you should finish the |
| installation, maintenance and training in one week. If overtake one week, you should pay US$**0 |
| per day to the us for every calendar day until all things are finished. You shall be liable for all the |
| expenses of air-tickets, food and housing of the Seller's engineer, and a qualified translator shall be |
| made to the Seller's engineer during the trip. |
| 2. We shall train your qualified personnel to the operation, service and maintenance procedures of all |
| machines and equipments. |