看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
AA and AAA Alkaline Battery Production Line AA and AAA Alkaline Battery Production Line
Next

AA and AAA Alkaline Battery Production Line

离岸价格

获取最新报价

450000 USD /

|

1 Minimum Order

国家:

China

型号:

01

离岸价格:

450000 USD / 获取最新报价

位置:

china

最小订单价格:

450000

最小订单:

1

包装细节:

wooden box or pallet

交货时间:

150days

供应能力:

100

付款方式:

T/T

產品組 :

-

现在联系
免费会员

联系人 bing

qianzhou, Wuxi, Jiangsu

现在联系

详情

Manufacturer direct sales AA and AAA alkaline battery production line and production equipment as well as various accessories I. Parameters of the alkaline production line 1. Design speed: **0 units/minute 2. Total power: Approx. *2KW 3. Total weight Approx. *5 tons 4. Dimensions: (L×W×H) ****0×***0×**0mm II. Equipment composing the alkaline battery production line 1. Ringing machine 2. Ring insertion machine 3. Upper mold sleeve machine . Glue coating machine 5. Electrolyte adding machine 6. Liquid absorption station 7. Lower mold sleeve machine 8. Pin insertion machine9. Flanging machine *0. Battery loading machine III. Main auxiliary equipment of the alkaline battery production line 1. Dust collector for the line 2. Positive electrode production line 3. Dust collector for the positive electrode production line 4. Battery spot welding machine 5. Battery assembly machine6. Battery inkjet machine 7. Battery testing machine 8. Negative electrode production line 9. Battery paper winding machine *0. Battery loading *1. Battery energy ring *2. Battery mold sleeve
4. Commissioning of the Alkaline Battery Production Line 1. Prepare for the no-load commissioning of the equipment. 2 Commissioning steps: (1) Adjust the dust cleaning controller to ensure the correct sequence of actions for the electromagnetic pulse valves and the correct order of dust cleaning units(2) Check the voltage of the electromagnetic pulse valves and the electrical control parts (*4V or **0V). (3) Check if seals on the equipment are loose or fallen off. (4) Maintain the pressure of the compressed air for spraying between 5~7 kg/cm². () Check if the motors and mechanical transmission parts on the equipment are running normally. (6) Check if the screws on the equipment are tightened. (7) no-load commissioning of the equipment, requiring all parts to run normally. (8) Conduct load commissioning of the equipment. Require all parts to run normally adjust the cleaning cycle based on the changes in equipment resistance (resistance method or timing method).

国家: China
型号: 01
离岸价格: 450000 / 获取最新报价
位置: china
最小订单价格: 450000
最小订单: 1
包装细节: wooden box or pallet
交货时间: 150days
供应能力: 100
付款方式: T/T
產品組 : -

Send a direct inquiry to this supplier

至:

bing < Wuxi Norshun Intelligent Equipment Co. , Ltd. >

我想知道: