2 pieces under the platform,2
pieces under the chassis (optional)[1]
vertical and horizontal mobile hydraulic leg of the balance
will be a total of 4 pieces. These legs will be mounted in the
frame of the independent platform. Angled legs during the
operation of the crane will come down, meanwhile the carrier
vehicle's chassis, axles and shears will not load.
Combined bending and torsion
foot booms sensitive resources, etc. as resistant high-strength
material type of box will be manufactured.
On the foot of retainers
imported blocking valves will be used.