Sinonine provides clients with services of
beneficiation test, engineering design, equipment supply,
installation & commissioning and technical training etc., and
solves the common problems in plant construction such as budget
overrun, schedule delays, unqualified equipment, unclear recovery
benefit, disputes of the suppliers, and unclear responsibility of
after-sale service. Sinonine have been dedicated to provide more
professional beneficiation plant EPC service for customers, and
constantly improves and optimizes their own service, formed a set
of our own service system. Sinonine have the confidence to ensure
the every step of EPC project can be carried out smoothly for
customers.
Engineering
Consulting
Engineering consulting makes
clients have a comprehensive understanding of beneficiation plant,
including the value of mine, the useful elements, available mineral
processing technology, plant scale, required equipment and general
period.
When a client needs engineering
consulting, we will first arrange an expert with rich dressing
experience to analyze whether the specific ore can be separated or
not based on the mineral elemental analysis sheet. Engineering
consult takes on the economic benefits analysis for the customers
including the cost analysis and profit estimate. The economic
benefit analysis will allow clients to have a rough understanding
about the investment and earnings of mine, and guide the future
investment.
Beneficiation
Test
The clients should provide about
*0kg ore samples, or **0 to***0kg for some special samples. First
we will analyze the material components to get some data for the
subsequent beneficiation test. Testers take the exploratory testing
from experience at first to find the best solution for
beneficiation and
make more detailed analysis .After
finishing all the tests, tester will summarize and write a detailed
Beneficiation Test Report.
Engineering
design
After reaching an agreement with
customer, we start to organize a working team for the engineering
design, including: planning, investigation, data collection,
planning and optimization, project evaluation, report writing, and
form a formal report after exchanging views with customer. By the
data collection and the feasibility study from the various
professionals, a feasible plan for the plant construction would be
finally made, and the " Feasibility Study Report
" shall be submitted to the relevant departments.
After "Feasibility Study Report" approved, the
design team starts the preliminary design and comes up with the
design scheme of beneficiation plant construction. The design
mainly involves: beneficiation, general layout, electric power,
communication, civil engineering, environmental protection, water
supply and drainage, tailings, safety and fire protection,
investment estimates, economic benefit.
Equipment
manufacturing
Sinonines affiliated factories are
responsible for the equipment manufacture which can make full set
of main and auxiliary equipments for the ****0tpd beneficiation
plant.We haveformed a complete and strict quality
management system in equipment manufacture, its operation is in
strict accordance with the requirements of the quality
manual.
Packing &
delivery
The packing and delivery of
equipments is the most important preparing work for installation
& commissioning. It is directly related to the cargo
transportation, and the results of installation and
commissioning.
We will take apart the equipment
before delivery, and then adopt suitable packing way for every
part.
The equipments are usually
delivered abroad by trucks, trains or shipment, we have established
good relationship with large cargo agent and shipment companies,
the rich experienced ensure goods reach on site safety and
promptly.
Installation
and Commission
Installation and commission of
beneficiation plant equipments is a very careful work with strong
practicality. Any error may lead to low recovery and falling
short of the expectation. In view of the importance of
installation and commission, installation personnel we sent out are
participated in the whole plant design, they are rich experienced
and very familiar with structure, performance and using of
equipments. The technician can quickly solve many actual problems
in plant construction
Technician
Training
Technician training is
simultaneous with the installation & commission in order to
save time and cost for customers. Training technician on site makes
the production line work earlier and bring benefits. On the other
hand, it can set up one technical team for customers to guarantee
the normal operation of the factory in the future.
Designed
Capacity Reached and After-sale
Service
Achieving production targets
includes expected recovery rate reached, design capacity for
clients reached, the quality of product reached, the consumption
indicators meeting requirement, effective controlling of production
cost and the stable operation of processing equipments. Whether the
recovery rate is guaranteed is the key of target reached. We
guarantee the recovery rate reaches the expectation value, and
solve all the problems which jeopardize the recovery rate to make
the beneficiation plant start soon and reach the target.
After finishing the services, we
would regularly visit customers to provide after-sale technical
supports and to solve problems of beneficiation plant. For
equipments supplied , we could provide one year warranty and be
responsible for any problems with the them.
国家: | China |
型号: | - |
离岸价格: | 0 ~ 1 ( Negotiable ) 获取最新报价 |
位置: | China |
最小订单价格: | - |
最小订单: | 1 |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | L/C, T/T |
產品組 : | - |