China
联系人 Mr. Shirley
Linhe NO.15, Beijing, Beijing
External formwork of *2/*4 meters post-tensioning concrete
pre-fabricated box girder is divided into sliding mode and rolling
mode; the side form of the first mode can move from one bottom form
to the other one which increases the utilization rate, and decrease
the investment for the formwork during construction; the side form
of the second mode is relatively fixed according to the bottom
form, and could be dismantled by revolving, which improve the
efficiency of formwork closure. All the edges of external formwork
panels for the box girder have been milled, which ensure the
assembly precision to avoid the leakage of the concrete. The bottom
formwork unit is 3 meters to facilitate the installation and
anti-arch adjustment; the side formwork unit is mainly 6 meters,
the design of the structure is compact and reasonable with
beautiful and smooth appearance. The bulkhead is designed to
envelop the sideform, which can be wholly assembled, making the
removal, installation and adjustment much easier.
| 国家: | China |
| 型号: | CNBM1 |
| 离岸价格: | 获取最新报价 |
| 位置: | - |
| 最小订单价格: | - |
| 最小订单: | 1 Set |
| 包装细节: | - |
| 交货时间: | - |
| 供应能力: | 1 Set per Day |
| 付款方式: | L/C, T/T |
| 產品組 : | - |