China
联系人 Mr. Shirley
Linhe NO.15, Beijing, Beijing
We are offering our customers a wide range of Segment Assembly
Formwork. The pre-casting and assembly technology has been being
improved. The construction advantages of the technology are
obvious, especially in the area confined by natural conditions.
Along with the rapid development of the highway and railway, the
construction of the bridges for the canyons and rivers has adopted
this technology, especially to build medium span pre-stressing
concrete beam by the pre-casting segment assembly technology with
MSS which affect the transportation less, available for more
natural conditions and cost less time. It is also the trend of
development.
This technology, comparing with other construction technologies,
has the unparalleled advantages of easy quality control, less
construction period, pre-stressing concrete and less disturbance,
etc.
We are offering our customers a wide range of Segment Assembly
Formwork. The pre-casting and assembly technology has been being
improved. The construction advantages of the technology are
obvious, especially in the area confined by natural conditions.
Along with the rapid development of the highway and railway, the
construction of the bridges for the canyons and rivers has adopted
this technology, especially to build medium span pre-stressing
concrete beam by the pre-casting segment assembly technology with
MSS which affect the transportation less, available for more
natural conditions and cost less time. It is also the trend of
development.
| 国家: | China |
| 型号: | CNBMSAF |
| 离岸价格: | 获取最新报价 |
| 位置: | - |
| 最小订单价格: | - |
| 最小订单: | 1 Set |
| 包装细节: | - |
| 交货时间: | - |
| 供应能力: | - |
| 付款方式: | L/C, T/T |
| 產品組 : | - |