离岸价格
获取最新报价1 USD /
|- Minimum Order
国家:
China
型号:
Non-standard
离岸价格:
1 USD / 获取最新报价
位置:
-
最小订单价格:
1
最小订单:
-
包装细节:
Using stretch film to wrap the large-scale equipment to prevent scratch, pack the small parts with c
交货时间:
3 Months
供应能力:
12 Set per Year
付款方式:
L/C, T/T
联系人 Tony
Jiaoshe village No.1113, Dongguan, Guangdong
Packaging Details: | Using stretch film to wrap the large-scale equipment to prevent scratch, pack the small parts with corrugated carton, and the heavy parts with wooden case |
---|---|
Delivery Detail: | 3 Months |
Our Ceramic Coating Production Linecan use nonstick ceramic paint to coat the cookware ,the advantage of nonstick ceramic paint as follow:
The whole of Ceramic Coating Production Line can be customized according to clients requirement ,such as the size range of your work piece, production capacity you want , technological process you required ,and the layout design to meet your work shop.
Main equipments included inCeramic Coating Production Line as follows ( can be selectable and adjustable):
Equipment Name |
Function and Description |
Desktop Pretreatment With Drying Oven( before sandblasting ) And equipped withThe central electric control cabinet |
Automatic degreasing ,water- washing ,air blowing ,drying and cooling ,it's usually used for dedusting and derusting before sandblasting. The process of acid washing ,alkali washing ,neutralizing and water washingcan be designed according to clients requirement or the feature of work piece. |
Sandblasting Machine |
We have a variety of type for client to choose, automation, semi-automation ,manual and the production output can be customized according to client's requirement. The machine equip with dust collecting device , and sand recycle device. |
Automatic Dedusting Room |
Using for dedusting before the process of spraying primer |
Preheating Oven |
Adopt the form of far infrared radiation heating to preheat the work piece before spraying primer, the temperature is usual about *0℃ |
Double-layer water-curtain room |
Used for coating spraying, adopt imported famous brand spray guns, water- curtain is used for absorbing and cleaning the atomized paint to avoid polluting the environment and harming the health of workman. |
Drying Oven and High Temperature Curing Furnace |
The drying oven is used for drying primer coating , and the high temperature curing furnace is used for curing the mid-coating and top-coating ,the temperature is about ******0℃. |
Supporting System |
Central Control System , exhaust piping and drain piping system , waste water treatment system and environmentally friendly waste gas treatment system |
The pdoduction flow of Ceramic Coating Production Line can be customized according your requirement , only for reference as follow:
Production flow / technological process |
|
Pre-treatment before sandblasting |
Loading > Degreasing > Wash > Acid Wash / Alkali Wash > Neutralizing > Wash > Blow water > Drying > Cooling > Unloading ( for sandblasting) |
Sandblasting |
Loading > Sandblasting > Unloading the work piece to coating conveyer belt |
Coating Process |
Loading> Auto dust removal > preheat> primer spray > spray top-coat > transfer workpiece> low temperature Volatilize> high temperature sintering > sharp freezing > Unloading |
Outer Coating (Optional) |
Loading > Spray outer coat > Turn to high temperature furnace > high temperature sintering > Sharp freezing > Unloading |
Design |
We have a professional Engineering Design Teamto design scheme to meet your requirements , such as size rang of work piece , capacity of production , and other especial requirement |
Manufacturing |
We have an excellent manufacture team to produce the products of superior quality , which be made using best material. We have a professional Engineering Design Team |
Installation and Debugging |
We can sent engineer on site to charge of Installation and debugging |
After-service Promise |
We promise to provide 1 year warranty of maintenance |
1. What is the quotation process of our company ?
We need to know your requirement as follow (point 2),then we will arrange budget.
2. Which the requirement or parameter we should know?
We hope to get the first information you provide as follow:
1) The name of work piece
2) The size of standard work piece
3) The max. size and weight of work piece
4)
The material of work piece
5) The capacity of coating line you desire
6)
The heating resource (electricity ,diesel, LPG ,nature
gas?)
7)
What is the voltage you provide?
8) Have any special requirement of process flow .
9)
Which kind of paint do you use? Does it have any special
drying temperature and time requirement?
*0) It is better to provide the workshop
building layout drawing, according to it ,we can arrange the
layout of coating line .
3. How much time to finish theCeramic Coating Production Line?
It takes almost **3 months to finish the Ceramic Coating Production Line after we both agree on scheme and sign the contract.
4. How
to use it?
We'll provide onsite
installation and training service till your workers can fully
operate it for production purpose.
国家: | China |
型号: | Non-standard |
离岸价格: | 1 / 获取最新报价 |
位置: | - |
最小订单价格: | 1 |
最小订单: | - |
包装细节: | Using stretch film to wrap the large-scale equipment to prevent scratch, pack the small parts with c |
交货时间: | 3 Months |
供应能力: | 12 Set per Year |
付款方式: | L/C, T/T |
產品組 : | Non-stick Coating Production Line |