联系人 Austin
Los Angeles, California
Chlorinated Polyethylene Membrane for High
Speed Rail
The chlorinated polyethylene waterproofing
membrane is a colorful elastic waterproof material made of
chlorinated polyethylene resin as the base
material.
Product Description
The chlorinated polyethylene waterproofing
membrane(CPE waterproof membrane) is a colorful
elastic waterproof material made of chlorinated polyethylene resin
as the base material, mixed with chemical additives and fillers,
and processed by plastic refining, hot compounding, calendering,
crimping, and other processes. The product divides into N class
homogeneous and L class fiber conforming.
The main material of chlorinated
polyethylene, no double bond in its macromolecular structure, has
good aging resistance, oil resistance, and chemical
resistance;blending with rubber, high elasticity, high elongation,
and good low-temperature resistance, and has strong adaptability to
foundation settlement and concrete shrinkage
joints.
From this aspect, chlorinated polyethylene
rubber blended waterproofing membrane has the dual characteristics
of chlorinated polyethylene and rubber, is a better
waterproof membrane for high speed rail.
Features of Waterproof Membrane for High
Speed Rail:
1. High tensile strength, strong seepage
resistance, good low-temperature flexibility, small expansion
coefficient, strong adaptability to deformation, big coefficient of
friction, can be used with a variety of adhesives, good bonding
effect;
2. Aging resistance, long service
life;
3. It can directly construct on freshly cast
concrete, which can effectively shorten the construction period and
save the construction cost.
Cautions:
①Configured paint should use up within *0
mins, with the allocation.
②Rainy days, snowy days, more than five
winds, the temperature is higher than *5 ℃ or lower than 5 ℃ is not
suitable for construction.
③Pay attention to ventilation when storing
and transporting, avoid direct sunlight, and prohibit direct
contact with acid, alkali, oil, and chemical solvent. Place in a
cool and dry place, suitable temperature **5℃~*5℃. The storage
period is *2 months.
Construction
Method:
①Preparation: clean up the oil, slick,
cement slag, loose layer, etc. On the base surface, treat and
repair the unevenness; do waterproofing reinforcement layer on
specific parts first before large area
construction.
②Construction: paste waterproofing materials
with polyurethane or cement-based adhesive. Side painting binder
while paving waterproofing materials, while scraping board in the
upper part of the coil back and forth scraping solid, forbidden to
have bulging, blistering and other phenomena, polyurethane
waterproofing coating or cementitious adhesive for
sealing.
国家: | China |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | China |
最小订单价格: | - |
最小订单: | 1000 Square Meter |
包装细节: | / |
交货时间: | 15-20 days after payment |
供应能力: | 35000 Square Meter per Month |
付款方式: | T/T |
產品組 : | - |