离岸价格
获取最新报价500 ~ 750 USD / Metric Ton ( Negotiable )
|1000 Metric Ton Minimum Order
国家:
Nigeria
型号:
-
离岸价格:
500 ~ 750 USD / Metric Ton ( Negotiable )获取最新报价
位置:
-
最小订单价格:
500 per Metric Ton
最小订单:
1000 Metric Ton
包装细节:
Sack/Cartons
交货时间:
35 to 45 days
供应能力:
30000 Metric Ton per Month
付款方式:
L/C, Other
產品組 :
-
联系人 Mr. anthony
Zuma House PLOT 26 SECTOR CENTER C, GUDU DISTRICT, Abuja, FCT
ETA Zuma Group
is a conglomerate with diverse
business interests in various industries.
The following are core
business areas of the group:
·
Exploration and Mining of
Solid Minerals (Coal, Iron Ore, Gold, chromium, copper and
marble).
·
Coal Mining
·
Power
Generation
·
Steel
Production
·
Coal Briquette
Production
THE GROUP BUSINESSES ARE
CARRIED OUT THROUGH THE FOLLOWING
COMPANIES:
v Zuma 828 Coal
Limited
v Zuma Energy WA Limited; Itobe
1- 4 Coal Power Limited
v Zuma Steel WA
Limited
v Energy and Metal Industry WA
Limited
v IMEX Mineral Resources and
Processing Company Limited
ZUMA 828 Coal
LTD
The Zuma 828 Coal Limited is a
modern coal mining company with state- of the- art mining equipment
such as; DozerD9R, Loader-988H7cu.m (Caterpillar), Zenith Crusher
(200ton/hr) and a 100tons Metler Toledo Weighbridge, making it the
most active coal mine site in Nigeria, today. It is located at
Okobo, Kogi State. At operation capacity the company mines over a
thousand tons of coal per day. With the demand for coal on the
rise, and with over 380 million metric tons of proven reserve, and
over 1.5bn ton inferred, the company is strategically positioned
and has the requisite professionals and equipment to satiate the
growing appetite for coal consumption from any part of
Nigeria.
Itobe 1- 4
COAL POWER LIMITED:
As a result of the Federal
Government of Nigerias policy initiative to diversify sources of
power generation with emphasis on coal and gas, the company
acquired licenses to generate a total of 1200 megawatt of Coal
Fired Power Plant at Itobe, Kogi State, and 400 megawatt thermal
electricity at Egbema, Imo State. The Coal Fired Power Plant is in
four phases of 300MW each, and at pre construction stage of project
implimentation, it will be the first of its kind in Nigeria when
completed using Circulating Fluidized Bed(CFB). Both energy
plants will be selling electricity to the national grid. This will
create up to 10, 000 jobs and hundreds of thousands of ancillary
jobs for the unemployed Nigerians.
So far, Itobe Coal Power Ltd
has achieved the following mile stone:
} Completed Power Location and
Evacuation Study leading to approval for Tie-in to National Grid
granted by Transmission Company of Nigeria (TCN).
} Obtained a Water intake permit
for the River Niger granted by the National Inland Waterways
Authority (NIWA)
} Concluded the topographic
survey and Aerial mapping (Lidar Survey) of the
site.
} The ESIA study for LTR,
Limestone Mine, PTL and Coal Mine for CFPP & PTL has been
conducted and approval gotten from the Federal Ministry of
Environment, the CTR is ongoing.
} Concluded geotechnical
investigation of the site with Consultant.
} Group is at advanced stage of
development of the Zuma Marble Quarry at Ekerin-Adde for limestone
supply to the power plant. Limestone is used as fluxing agent in
the CFB Boiler for emission control.
} Concluded feasibility work
with Royal Haskoning Engineering as consultant on the Jetty aspect
of the Power Plant Project. Royal Haskoning is a world leader in
maritime and ports consultancy and the company handles the
consultancy for the dredging of the River Niger from the Coastal
Warri through Onitsha- Lokoja to Baro in the Northern part of
Nigeria on behalf of the Federal Government
} Concluded the processes of
Expression of Interest EOI to prospective Engineering, Procurement
& Construction (EPC) Contractors.
} Signed initial agreement with
EPC Contractor for the CFFP including supporting infrastructure-
Poly Technologies China.
} Concluded geotechnical
investigation and appraisal of the site through consultant; Fugro
Nigeria.
It is the intention of Itobe
Coal Power Ltd to utilize Engineer, Procure & Construct (EPC)
contract approach for the development of this project with the
first unit of 300 MW expected to commence construction from the
third quarter of 2015. The second unit is expected to follow one
year after operation of the first unit.
IMEX Mineral
Resources and Processing Company
Limited:
With a workforce of over 50
core staff including competent and dedicated professionals, the
Imex Coal Briquette factory is the first of its kind in West
Africa, and the game changer in the alternative/renewable energy
mix. The factory is at Ankpa, Kogi State, and produces coal
briquettes as well as coal stoves, to support the enormous domestic
energy consumption in Nigeria. With no less than three production
lines equipped with modern dozer-crusher-mixer-dozer- press
collector, it can produce over 80, 000 coal briquettes/day for
domestic and industrial uses for cooking, as against the use of
fire wood. The efficacy of the briquette is a delight to
observe when cooking with it, and this has alighted interest among
the youths and currently creating a lot of sustained employment
within and around Ankpa town, as they are being trained by Imex, on
making the briquettes themselves with mini-manual briquette making
press. This will be replicated gradually nationwide to
systematically divert peoples dependency on firewood to coal
briquette.
国家: | Nigeria |
型号: | - |
离岸价格: | 500 ~ 750 / Metric Ton ( Negotiable ) 获取最新报价 |
位置: | - |
最小订单价格: | 500 per Metric Ton |
最小订单: | 1000 Metric Ton |
包装细节: | Sack/Cartons |
交货时间: | 35 to 45 days |
供应能力: | 30000 Metric Ton per Month |
付款方式: | L/C, Other |
產品組 : | - |