This machine is designed to place **0 ton concrete box beams. It can also reduce dimension by itself without disassembly in order to pass through tunnels with the help of the tyre trolley, which will save time and money for the erection of bridges.
1.1 Working condition
·For erecting the concrete box beam in areas that bridges connect with tunnels, the machine can go through the tunnel and erect the beam 7m away from the entrance of exit or the tunnel.
·Going through on the continuous beam, combination beam or railway basement.
·Different height of the concrete box beam in one bridge
· Surmountable slope 2 %
· Min. radius of the bridge ***0m.
Wind speed: *2km/h with load, **4km/h without load
1.2 Main technical characteristics
·Change the machine from the high position into lower position through a hydraulic system. Then the launching gantry can go into or out of tunnels in a lower position with the help of tyre trolley.
·This machine can place segments with a distance of 7m from the tunnel entrance or exit.
·Transported without the help of supporting frame.
·Fixed lifting point creates a good stability
Changing jobsite with the help of tyre trolley.
国家: | China |
型号: | 900ton Launching Gantry |
离岸价格: | ( Negotiable ) 获取最新报价 |
位置: | P.R.China |
最小订单价格: | - |
最小订单: | 1 Set |
包装细节: | sea worth packing |
交货时间: | 6 months |
供应能力: | 6 Set per Year |
付款方式: | L/C, T/T |
產品組 : | Launching Gantry |