看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Gas Booster System
Next

Gas Booster System

离岸价格

获取最新报价

|

1 Set Minimum Order

国家:

China

型号:

G3032-M-50

离岸价格:

获取最新报价

位置:

China

最小订单价格:

-

最小订单:

1 Set

包装细节:

wooden case

交货时间:

8-10 weeks

供应能力:

100 Set per Year

付款方式:

T/T, L/C

產品組 :

-

现在联系

联系人 Jennie

SHIYAN, Shenzhen, Guangdong

现在联系

详情

This gas booster system is a newly designed model of pneumatic power unit which adopted the United State’s pneumatic pressure principle and combined customer’s specific requirements. It takes compressed air as the power source, takes air operated booster as the pressure source, the drive air pressure and output pressure are in a direct ratio. Through the adjustment of the air supply can freely adjust the output pressure value. When drive air pressure and output pressure reach to a balance, gas booster will stop working automatically, and output pressure will keep at a pre-adjusted level, if there is pressure drops because of leakage, the booster will restart working automatically to compensate the pressure. Through controlling the quantity of pressure of air supply can realize the control of the working frequency (CPM) of the booster, and thus to realize the proper control of system output pressure.
The whole equipment has the merits of a framework structure, compact design, light weight, simple operation, safety and reliability.
 
 Features and Benefits
l         The system takes air operated gas booster to pressurize. Through the adjustment of the air supply can adjust the system pressure. The ball valve is used for controlling the drive air supply and thus to freely control the booster’s working conditions. The booster can be shut down quickly when the pressure is reaching to the desired value to avoid possible pressure overshooting.
l         High pressure booster pumps, valves, tubing and fittings made of **6SSguarantee the test precision and stability.
l         Air-operated gas booster with special isolated packing makes no contamination to mediums.
l         Supplied with safety valve, shut off valve, stainless steel tubing and fittings etc.
l         International standard thread connections allow repeated and easy assembling and disassembling.
l         Adjustable and wide range of output high pressure.
l         Compact design, convenient shift and low noise, easy operation and simple maintenance.
 
 Technical Specification:
1.        Model:G****-M**0
2.        Pressure outputMAX.***0PSI
3.        Displacement*2.7cu.In/stroke
4.        MediumN2, Air, H2 and other inert gases (No O2.)
5.        Gas supply Pressure*0psi≦P≦***0psi
6.        Driver Air*0psi≦P≦**0psi
7.        Conditions: oil content:≤5ppm;
dew point :< 5°C;
flow rate:≥1.5NM3/min;
8.        Dimension**0mm×**0mm×**0mm
This set of device is mainly consisted of pump-valve installing frame, which is filled with all the valves, pipelines and so on. And the installation of pipeline complies with the horizontal-vertical principle to create a rational layout; all the pipelines are connected with stainless steel pipes. The whole testing process can be achieved through the control s/switches on the control panel.
1  Maintenance
(1) The operator must be trained and know well with the working principle, operating procedures and daily maintenance;
 
(2) The water in the air filter should be removed promptly, turn on the at bottom of the air filter, can remove the water under a certain pressure;
 
 
(3) The gases or air must be clean. And the pipeline filters should be cleaned regularly;
(4) The joints may become loose because of the shakings when transporting and working. So please check the joints to avoid the leakages occasionally;
(5) Keep equipment clean and tidy;
(6) Prevent high temperature, dust, corrosive media, water and etc. to invade the system;
(7)Periodic inspection, keep all parts and elements completely.
(8) Keep the clamps and fittings dry (if it has);
(9) Make sure the drive air source is dry and clean in order to preventing the possible damages from seal parts of booster or check valves, etc.
 
2safety guide 
1)       Security rules should be strictly fulfilled by operators. And supervisors should be available as well.
2)       For H2 boosting within its capability, the operations of the valves shall be done slowly, the working frequency of booster shall be as slowly as possible to avoid possible burning of H2;
3)       Check the connections of all the pipeline regularly to avoid leakage of H2;
4)       for H2 boosting, check the breather of booster first, the specific operations as following:
a. Turn on the valve of H2 cylinder, and filling H2 into the booster system and keep it on non-working status;
b. Remove the breather and, stuff up the connecting pipe by fingers;
If the leakage of gases can be felt obviously (press increased on your fingers), that means the seal parts of gas booster was abraded, and H2 has been leaking, please turn off the hydrogen cylinder immediately. And ventilate the testing site such as by opening the doors and windows.
Please contact with the supplier for the further services, it’s forbidden to remove or maintain it by the non-professionals, or to replace any non-standard components;
5)       For charging cylinders or pressure vessels, if you don’t want the residual air of pipelines to get into the pressure vessels, please exhaust the air by unloading valve. Shown as follow:
a. Connect the gas source vessel with the filling cylinder well, and make sure the valves of them are closed.
b. Open the valve of gas source cylinder, and then the gases will flow into the pipelines of gas booster system;
c. Slowly turn on the unloading valve for **5 seconds to vent the residual air;
d. Turn off the unloading valve and, turn on the valve of filling cylinder, to start the charging operations.
 
 

国家: China
型号: G3032-M-50
离岸价格: 获取最新报价
位置: China
最小订单价格: -
最小订单: 1 Set
包装细节: wooden case
交货时间: 8-10 weeks
供应能力: 100 Set per Year
付款方式: T/T, L/C
產品組 : -

相关产品 IVS Tester Corporation China Assembly Centre

Send a direct inquiry to this supplier

至:

Jennie < IVS Tester Corporation China Assembly Centre >

我想知道: