看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Large Capacity Gold Mining Machine Large Capacity Gold Mining Machine Large Capacity Gold Mining Machine Large Capacity Gold Mining Machine Large Capacity Gold Mining Machine
Next

Large Capacity Gold Mining Machine

离岸价格

获取最新报价

10000 ~ 2e+07 USD / Set

|

1 Set Minimum Order

国家:

China

型号:

xh

离岸价格:

10000 ~ 2e+07 USD / Set 获取最新报价

位置:

-

最小订单价格:

10000 per Set

最小订单:

1 Set

包装细节:

as your require

交货时间:

20 days to 35 days

供应能力:

10 Set per Month

付款方式:

T/T

现在联系
免费会员

联系人 Ms. Flora

No. 188, Xinhai Street, Fushan high-tech industrial development district, Yantai, Shandong

现在联系

产品规格

  • capacity:10ptd--20000tpd
  • powder:as your require

详情

【Process Introduction】

Gold CIP Production Line adsorbs gold from cyaniding pulp by active carbon including 7 steps: leaching pulp preparation, cyaniding leaching, carbon adsorption, gold loaded carbon desorption, pregnant solution electrodeposit, carbon regeneration, leaching pulp.It is very useful gold recovery method in mineral processing.
image

【Application】

There are two kinds of ore suitable for gold CIP production line: flotation gold concentrate, amalgamation and gravity tailings; mudded oxidized ore
[Process Description]

 

 
Xinhai gold EPC project in Sudan mainly adopt the method of carbon absorption. This method  adsorbs gold from cyaniding pulp by active carbon including 7 steps: leaching pulp preparation, cyaniding leaching, carbon adsorption, gold loaded carbon desorption, pregnant solution electrodeposit, carbon regeneration, leaching pulp, which received a high recovery rate of 92.5%. Impurity removing of gold CIP production line

Before the adsorption of cyaniding pulp, remove the wood chips to avoid it adsorbs the gold and blocks the carbon screen.

Leaching and adsorption of gold CIP production line

Adding carbon in the leaching tank; the carbon absorbs gold becoming gold loaded carbon. After adsorption, carbon screen separates the carbon and pulp.

Desorption electrolysis of gold CIP production line

Under high temperature and pressure, gold loaded carbon separates gold mud and carbon in closed system
image

Smelting of gold CIP production line

After simple pickling and impurity removal, the gold ingots are obtained

Desorption electrolysis system with high efficiency, low energy consumption and fast

Under the high temperature and pressure, this system has advantages of no cyanide, automatic controlling, high efficiency, fast and low energy consumption.

High Efficiency: When the grade of gold loaded carbon reaches 3000g/t, desorption rate can reach more than 96%.

Fast: due to the high temperature and pressure, the time of desorption electrolysis is 12 hours shortened by 50-70%
image

Low energy consumption: due to the same temperature and fast working, the energy consumption is 1/2-1/4 of regular system

No cyanide: without adding NaCN in desorption solution, low cost and no pollution

High grade gold mud, extract gold mud easily

Automatic control: installed level liquid control system, temperature control system, automatic control system

Safety: With three security measures, system intelligent, automatic limit pressure and pressure release mechanism, safety valve
image

国家: China
型号: xh
离岸价格: 10000 ~ 2e+07 / Set 获取最新报价
位置: -
最小订单价格: 10000 per Set
最小订单: 1 Set
包装细节: as your require
交货时间: 20 days to 35 days
供应能力: 10 Set per Month
付款方式: T/T
產品組 : mining processing plant

Send a direct inquiry to this supplier

至:

Ms. Flora < Shandong Xinhai Mining Technology & Equipment Inc. >

我想知道: