China
联系人 Baron
Jiya Industrial Park Dongpu Village, Dongguan, Guangdong
Mechanical parts processing technical
requirements for a summary outline of the processing parts: 1, did
not meet the requirements of GB******0 Note the shape of tolerance.
2, did not note the length dimension tolerance ± 0.5mm. 3, did not note radius R5. 4, are not
chamfer note C2. 5, acute blunt down. 6, sharp edges down blunt,
burr burr.
Parts surface
treatment:
1: On the part
machined surface, no defects scratches, abrasions and other damage
to parts of the surface.
2:There is no
thread surface machining black, bump, Labelling and burrs. All
parts need to be coated steel surface before painting must be rust,
scale, grease, dust, dirt, salt and dirt, etc.
Removed.
3:Before the
rust, first with an organic solvent, lye, emulsifier, steam and
other steel parts surface to remove grease, dirt.
4:The surface to
be coated and primed by shot peening or hand rust time interval not
more than 6h.
5Riveting pieces
mutual contact surfaces must be painted before connecting a
thickness of *0 ~ *0μm
rust. Lap edge applications of paint, putty or an adhesive closure.
Damage due to manufacturing or welding primer, to
re-painting.
Part of the
heat treatment:
1:After
quenching, HRC*0 ~ *5.
2:Carbon steel:
*5 or *0Cr parts for high-frequency quenching, **0 ~ **0
℃ tempering, HRC*0 ~
*5.
3:Carburizing
depth of 0.3mm.
4:High-temperature aging
treatment.
After
finishing technical requirements, the part is placed after
finishing shall not be placed directly on the ground, should take
the necessary support and protection measures.
2:Does not allow
machined surface rust and moth affect performance, or appearance of
life bump, scratches and other defects.
3:Finishing the
rolling surface, without peeling after rolling.
4:The final step
after the heat treatment of parts, there should be no surface
oxide.
After finishing the mating surfaces of the tooth
surface should have sealed annealing parts:
1:Must be soaked
in oil before each seal assembly.
2:Strict
inspection before assembly and cleared parts processing residual
acute angle, burrs and foreign matter. When load to ensure the seal
is not scratched.
3:The adhesive
should be cleared out of the excess adhesive.
国家: | China |
型号: | - |
离岸价格: | ( Negotiable ) 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | 500 Piece |
包装细节: | WOODEN |
交货时间: | 25DAYS |
供应能力: | 5000 Piece per Month |
付款方式: | T/T, Western Union, Money Gram |
產品組 : | - |