看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Q235 Galvanized Scaffolding Metal Plank
Next

Q235 Galvanized Scaffolding Metal Plank

离岸价格

获取最新报价

12 ~ 23 / Piece

|

100 Piece Minimum Order

国家:

China

型号:

KH-SW-240-001

离岸价格:

12 ~ 23 / Piece 获取最新报价

位置:

-

最小订单价格:

12 per Piece

最小订单:

100 Piece

包装细节:

bundled or bulk, as per customer

交货时间:

15 days

供应能力:

8 Forty-Foot Container per Week

付款方式:

T/T

现在联系
免费会员

联系人 Fu

Room B303, Jingying Garden, No. 3, Jingsha 2nd Road, Shajing Street Office, Shajing Town, Bao'a, Shenzhen, Guangdong

现在联系

产品规格

  • 210mmx45mmx1.0mmx3000mm:Galvanized
  • 240mmx45mmx1.0mmx4000mm:Galvanized
  • 250mmx50mmx1.0mmx2000mm:Galvanized
  • 500mmx50mmx1.0mmx1829mm:Galvanized with hook
  • 500mmx50mmx1.0mmx1219mm:Galvanized with hook
  • 480mmx45mmx1.0mmx1219mm:Galvanized with hook

详情

Product detail:

 

1.Q**5 Galvanized Scaffolding Metal Plank

 

2.Material:Q**5,Q**5,Q**5

 

3.Surface treat:hot-dipped galvanized

 

4.Width:**0,**5,**0,**0,**0,**0,**0mm

 

5.Thickness: 1.**2.0mm

 

6.Length: To be produced as per your requirement

 

7.Folding box should be more stronger

 

8.Patent holes design to be reduced products' weight

 

9.Patent ribs make products stronger and drain the water providing any rain days 

 

*0.Life time:5 years guarantee

 

Dimension:

 

Item Wide (mm) Height (mm) Thickness (mm) Length (m) Folding Box support bracket Weight (kg)
KH-SW*******1 **0 *5 1.1 1.0 Normal flat support 3.*4
KH-SW*******2 **0 *5 1.1 1.5 Normal flat support 5.*2
KH-SW*******3 **0 *5 1.1 2.0 Normal flat support 6.*9
KH-SW*******4 **0 *5 1.1 2.5 Normal flat support 8.*6
KH-SW*******5 **0 *5 1.1 3.0 Normal flat support *0.*3
KH-SW*******6 **0 *5 1.1 4.0 Normal flat support *3.*8
KH-SW*******7 **0 *5 1.1 1.0 Normal rectangular support 3.*4
KH-SW*******8 **0 *5 1.1 1.5 Normal rectangular support 5.*2
KH-SW*******9 **0 *5 1.1 2.0 Normal rectangular support 7.*9
KH-SW*******0 **0 *5 1.1 2.5 Normal rectangular support 9.*6
KH-SW*******1 **0 *5 1.1 3.0 Normal rectangular support *0.*3
KH-SW*******2 **0 *5 1.1 4.0 Normal rectangular support *4.*8
KH-SW*******3 **0 *5 1.1 1.0 Normal trapezoid support 3.*1
KH-SW*******4 **0 *5 1.1 1.5 Normal trapezoid support 5.*6
KH-SW*******5 **0 *5 1.1 2.0 Normal trapezoid support 7.*0
KH-SW*******6 **0 *5 1.1 2.5 Normal trapezoid support 8.*4
KH-SW*******7 **0 *5 1.1 3.0 Normal trapezoid support *0.*8
KH-SW*******8 **0 *5 1.1 4.0 Normal trapezoid support *4.*7
KH-SW*******9 **0 *5 1.1 1.0 Equilateral flat support 3.*5
KH-SW*******0 **0 *5 1.1 1.5 Equilateral flat support 5.*2
KH-SW*******1 **0 *5 1.1 2.0 Equilateral flat support 6.*9
KH-SW*******2 **0 *5 1.1 2.5 Equilateral flat support 8.*6
KH-SW*******3 **0 *5 1.1 3.0 Equilateral flat support  
KH-SW*******4 **0 *5 1.1 4.0 Equilateral flat support *3.*8
KH-SW*******5 **0 *5 1.1 1.0 Equilateral rectangular support 3.*5
KH-SW*******6 **0 *5 1.1 1.5 Equilateral rectangular support 5.*2
KH-SW*******7 **0 *5 1.1 2.0 Equilateral rectangular support 7.*9
KH-SW*******8 **0 *5 1.1 2.5 Equilateral rectangular support 9.*6
KH-SW*******9 **0 *5 1.1 3.0 Equilateral rectangular support *0.*3
KH-SW*******0 **0 *5 1.1 4.0 Equilateral rectangular support *4.*8
KH-SW*******1 **0 *5 1.1 1.0 Equilateral trapezoid support 3.*1
KH-SW*******2 **0 *5 1.1 1.5 Equilateral trapezoid support 5.*6
KH-SW*******3 **0 *5 1.1 2.0 Equilateral trapezoid support 7.*0
KH-SW*******4 **0 *5 1.1 2.5 Equilateral trapezoid support 8.*4
KH-SW*******5 **0 *5 1.1 3.0 Equilateral trapezoid support *0.*7
KH-SW*******6 **0 *5 1.1 4.0 Equilateral trapezoid support *3.*4
KH-SW*******7 **0 *5 1.0 1.0 Normal flat support 3.*7
KH-SW*******8 **0 *5 1.0 2.0 Normal flat support 6.*3
KH-SW*******9 **0 *5 1.0 3.0 Normal flat support 9.*0
KH-SW*******0 **0 *5 1.0 4.0 Normal flat support *2.*7
KH-SW*******1 **0 *5 1.0 1.0 Normal trapezoid support 3.*5
KH-SW*******2 **0 *5 1.0 2.0 Normal trapezoid support 6.*1
KH-SW*******3 **0 *5 1.0 3.0 Normal trapezoid support 9.*8
KH-SW*******4 **0 *5 1.0 4.0 Normal trapezoid support *2.*5
KH-SW*******5 **0 *5 1.2 1.0 Normal rectangular support 4.*6
KH-SW*******6 **0 *5 1.2 2.0 Normal rectangular support 7.*2
KH-SW*******7 **0 *5 1.2 3.0 Normal rectangular support *1.*8
KH-SW*******8 **0 *5 1.2 4.0 Normal rectangular support *4.*4

 

 

Features:

 

1. The Pierced Steel Plank(PSP)is strong, light, simple, fool proof, safe and inexpensive.

 

2. It is so simple that it can be laid on any fairly level piece of land with a few days work.

 

3. It is so foolproof that if some parts are lost, it will still be useful. It must be safe for

any type of construction, under any weather conditions.

 

4. It is be so light that it can be transported swiftly and easily to any spot

 

5. The PSP(Piereced Steel Plank) was designed with holes to reduce the weight,

improve traction and facilitate drainage. Flanging the holes kept the mat durable

by compensating for the strength lost by removing a portion of the metal

 

 

Wide variety of consumers:

 

1. Temporary and permanent aircraft landing fields or runways

 

2. Temporary roadways or access routes for trucks, heavy equipment, backhoes, concrete trucks, tree trimmers and cranes.

 

3. Construction Sites

 

4. Helicopter Landing Pads

 

5. Irrigation Tracks

 

6. Launches and boat ramp extensions

 

7. Corrals and chutes for livestock

 

8. Warehouse flooring 9. Mobile home moving

 

*0. RV tracks or storage areas

 

*1. Storage platforms for heavy equipment, supplies or runways.

 

 

How to extend scaffolding walking Board

 

1.Have a 'competent person' assess and document the needs of the area for extended

scaffolding. A 'competent person' in some states is required to have special licensing,

and in others experience with scaffolding set up is enough. What is important is that

you keep some form of documentation that the person designated as 'competent'

approves each step of the scaffolding assembly

 

2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,

make sure that the supports for your scaffolding plans follow the assembly plans

 

3.Lay your first plank across the supports of your platform. Have your competent

person check that each plan extends a minimum of 6 inches and a maximum of

*2 inches past any support bracket.

 

4.Extend your scaffolding plank by laying the next plank over it. If the span

of your support is 7 feet, your plans must overlap a minimum of 6 inches up

to a maximum of *2 inches. If the span of your plank support is *0 feet, the boards

must overlap *2 inches.

 

5.You may provide cleats to additionally connect your extended scaffold planks again.

Ask your competent person to designate that the cleats are provided and used only

to prevent the scaffold planks from sliding and not as a means of providing any
 

国家: China
型号: KH-SW-240-001
离岸价格: 12 ~ 23 / Piece 获取最新报价
位置: -
最小订单价格: 12 per Piece
最小订单: 100 Piece
包装细节: bundled or bulk, as per customer
交货时间: 15 days
供应能力: 8 Forty-Foot Container per Week
付款方式: T/T
產品組 : Scaffolding Plank

Send a direct inquiry to this supplier

至:

Fu < Shenzhen King Hardware >

我想知道: