离岸价格
获取最新报价6 ~ 35 USD / Piece
|1000 Piece Minimum Order
国家:
China
型号:
KH-SW-250-001
离岸价格:
6 ~ 35 USD / Piece 获取最新报价
位置:
-
最小订单价格:
6 per Piece
最小订单:
1000 Piece
包装细节:
10pcs/bundle or as per customer's instruction
交货时间:
7~15 days
供应能力:
8 Twenty-Foot Container per Week
付款方式:
PayPal, Western Union, L/C, T/T
產品組 :
China
联系人 Fu
Room B303, Jingying Garden, No. 3, Jingsha 2nd Road, Shajing Street Office, Shajing Town, Bao'a, Shenzhen, Guangdong
Product
detail:
1.Galvanized scaffolding steel plank deck platform for
contruction and scaffolding system
2.Material:Q***-Q**5
3.Surface treat:hot-dipped galvanised
4.Width:**0,**5,**0,**0,**0,**0,**0mm
5.Thickness: 1.**2.0mm
6.Length: To be produced as per your requirement
7.Folding box should be more stronger
8.Patent holes design to be reduced products' weight
9.Patent ribs make products stronger and drain the water
providing any rain days
*0.Life time:5 years guarantee
Dimension:
Item | Wide (mm) | Height (mm) | Thickness (mm) | Length (m) | Folding Box | support bracket | Weight (kg) |
KH-SW*******1 | **0 | *5 | 1.1 | 1.0 | Normal | flat support | 3.*4 |
KH-SW*******2 | **0 | *5 | 1.1 | 1.5 | Normal | flat support | 5.*2 |
KH-SW*******3 | **0 | *5 | 1.1 | 2.0 | Normal | flat support | 6.*9 |
KH-SW*******4 | **0 | *5 | 1.1 | 2.5 | Normal | flat support | 8.*6 |
KH-SW*******5 | **0 | *5 | 1.1 | 3.0 | Normal | flat support | *0.*3 |
KH-SW*******6 | **0 | *5 | 1.1 | 4.0 | Normal | flat support | *3.*8 |
KH-SW*******7 | **0 | *5 | 1.1 | 1.0 | Normal | rectangular support | 3.*4 |
KH-SW*******8 | **0 | *5 | 1.1 | 1.5 | Normal | rectangular support | 5.*2 |
KH-SW*******9 | **0 | *5 | 1.1 | 2.0 | Normal | rectangular support | 7.*9 |
KH-SW*******0 | **0 | *5 | 1.1 | 2.5 | Normal | rectangular support | 9.*6 |
KH-SW*******1 | **0 | *5 | 1.1 | 3.0 | Normal | rectangular support | *0.*3 |
KH-SW*******2 | **0 | *5 | 1.1 | 4.0 | Normal | rectangular support | *4.*8 |
KH-SW*******3 | **0 | *5 | 1.1 | 1.0 | Normal | trapezoid support | 3.*1 |
KH-SW*******4 | **0 | *5 | 1.1 | 1.5 | Normal | trapezoid support | 5.*6 |
KH-SW*******5 | **0 | *5 | 1.1 | 2.0 | Normal | trapezoid support | 7.*0 |
KH-SW*******6 | **0 | *5 | 1.1 | 2.5 | Normal | trapezoid support | 8.*4 |
KH-SW*******7 | **0 | *5 | 1.1 | 3.0 | Normal | trapezoid support | *0.*8 |
KH-SW*******8 | **0 | *5 | 1.1 | 4.0 | Normal | trapezoid support | *4.*7 |
KH-SW*******9 | **0 | *5 | 1.1 | 1.0 | Equilateral | flat support | 3.*5 |
KH-SW*******0 | **0 | *5 | 1.1 | 1.5 | Equilateral | flat support | 5.*2 |
KH-SW*******1 | **0 | *5 | 1.1 | 2.0 | Equilateral | flat support | 6.*9 |
KH-SW*******2 | **0 | *5 | 1.1 | 2.5 | Equilateral | flat support | 8.*6 |
KH-SW*******3 | **0 | *5 | 1.1 | 3.0 | Equilateral | flat support | |
KH-SW*******4 | **0 | *5 | 1.1 | 4.0 | Equilateral | flat support | *3.*8 |
KH-SW*******5 | **0 | *5 | 1.1 | 1.0 | Equilateral | rectangular support | 3.*5 |
KH-SW*******6 | **0 | *5 | 1.1 | 1.5 | Equilateral | rectangular support | 5.*2 |
KH-SW*******7 | **0 | *5 | 1.1 | 2.0 | Equilateral | rectangular support | 7.*9 |
KH-SW*******8 | **0 | *5 | 1.1 | 2.5 | Equilateral | rectangular support | 9.*6 |
KH-SW*******9 | **0 | *5 | 1.1 | 3.0 | Equilateral | rectangular support | *0.*3 |
KH-SW*******0 | **0 | *5 | 1.1 | 4.0 | Equilateral | rectangular support | *4.*8 |
KH-SW*******1 | **0 | *5 | 1.1 | 1.0 | Equilateral | trapezoid support | 3.*1 |
KH-SW*******2 | **0 | *5 | 1.1 | 1.5 | Equilateral | trapezoid support | 5.*6 |
KH-SW*******3 | **0 | *5 | 1.1 | 2.0 | Equilateral | trapezoid support | 7.*0 |
KH-SW*******4 | **0 | *5 | 1.1 | 2.5 | Equilateral | trapezoid support | 8.*4 |
KH-SW*******5 | **0 | *5 | 1.1 | 3.0 | Equilateral | trapezoid support | *0.*7 |
KH-SW*******6 | **0 | *5 | 1.1 | 4.0 | Equilateral | trapezoid support | *3.*4 |
KH-SW*******7 | **0 | *5 | 1.0 | 1.0 | Normal | flat support | 3.*7 |
KH-SW*******8 | **0 | *5 | 1.0 | 2.0 | Normal | flat support | 6.*3 |
KH-SW*******9 | **0 | *5 | 1.0 | 3.0 | Normal | flat support | 9.*0 |
KH-SW*******0 | **0 | *5 | 1.0 | 4.0 | Normal | flat support | *2.*7 |
KH-SW*******1 | **0 | *5 | 1.0 | 1.0 | Normal | trapezoid support | 3.*5 |
KH-SW*******2 | **0 | *5 | 1.0 | 2.0 | Normal | trapezoid support | 6.*1 |
KH-SW*******3 | **0 | *5 | 1.0 | 3.0 | Normal | trapezoid support | 9.*8 |
KH-SW*******4 | **0 | *5 | 1.0 | 4.0 | Normal | trapezoid support | *2.*5 |
KH-SW*******5 | **0 | *5 | 1.2 | 1.0 | Normal | rectangular support | 4.*6 |
KH-SW*******6 | **0 | *5 | 1.2 | 2.0 | Normal | rectangular support | 7.*2 |
KH-SW*******7 | **0 | *5 | 1.2 | 3.0 | Normal | rectangular support | *1.*8 |
KH-SW*******8 | **0 | *5 | 1.2 | 4.0 | Normal | rectangular support | *4.*4 |
Features:
1. The Pierced Steel Plank(PSP)is strong, light, simple, fool
proof, safe and inexpensive.
2. It is so simple that it can be laid on any fairly level piece
of land with a few days work.
3. It is so foolproof that if some parts are lost, it will still
be useful. It must be safe for
any type of construction, under any weather conditions.
4. It is be so light that it can be transported swiftly and
easily to any spot
5. The PSP(Piereced Steel Plank) was designed with holes to
reduce the weight,
improve traction and facilitate drainage. Flanging the holes kept
the mat durable
by compensating for the strength lost by removing a portion of
the metal
Wide variety of
consumers:
1. Temporary and permanent aircraft landing fields or runways
2. Temporary roadways or access routes for trucks, heavy
equipment, backhoes, concrete trucks, tree trimmers and
cranes.
3. Construction Sites
4. Helicopter Landing Pads
5. Irrigation Tracks
6. Launches and boat ramp extensions
7. Corrals and chutes for livestock
8. Warehouse flooring 9. Mobile home moving
*0. RV tracks or storage areas
*1. Storage platforms for heavy equipment, supplies or
runways.
How to extend scaffolding walking
Board
1.Have a 'competent person' assess and document the needs of
the area for extended
scaffolding. A 'competent person' in some states is required to
have special licensing,
and in others experience with scaffolding set up is enough. What
is important is that
you keep some form of documentation that the person designated as
'competent'
approves each step of the scaffolding assembly
2.Assemble the frame of your scaffolding system. Whether it is
mobile or stationary,
make sure that the supports for your scaffolding plans follow the
assembly plans
3.Lay your first plank across the supports of your platform. Have
your competent
person check that each plan extends a minimum of 6 inches and a
maximum of
*2 inches past any support bracket.
4.Extend your scaffolding plank by laying the next plank over it.
If the span
of your support is 7 feet, your plans must overlap a minimum of 6
inches up
to a maximum of *2 inches. If the span of your plank support is
*0 feet, the boards
must overlap *2 inches.
5.You may provide cleats to additionally connect your extended
scaffold planks again.
Ask your competent person to designate that the cleats are
provided and used only
to prevent the scaffold planks from sliding and not as a means of
providing any
re-enforcement to the boards at all.
国家: | China |
型号: | KH-SW-250-001 |
离岸价格: | 6 ~ 35 / Piece 获取最新报价 |
位置: | - |
最小订单价格: | 6 per Piece |
最小订单: | 1000 Piece |
包装细节: | 10pcs/bundle or as per customer's instruction |
交货时间: | 7~15 days |
供应能力: | 8 Twenty-Foot Container per Week |
付款方式: | PayPal, Western Union, L/C, T/T |
產品組 : | Scaffolding Plank |