看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Stability Test Chamber
Next

Stability Test Chamber

离岸价格

获取最新报价

|

1 Piece Minimum Order

国家:

China

型号:

YP series

离岸价格:

获取最新报价

位置:

-

最小订单价格:

-

最小订单:

1 Piece

包装细节:

plywood

交货时间:

20 days

供应能力:

-

付款方式:

PayPal, L/C, T/T

產品組 :

-

现在联系
免费会员

联系人 Mr. Kevin

No.263, south Tai bai Road, Xian, Shaanxi

现在联系

产品规格

详情

Special technical services of the case which passed stability test by 3Q

Through a series activities such as: DQ (design confirmation), FAT (Manufacturers factory test), IQ (installation qualification), OQ (Operation confirmation), PQ (operating performance confirmation), the data and conclusions can prove that if the equipment can meet the requirements of production process, if equipment performance meet the requirements of design & products and GMP standard.


1.     Purpose of DQ: according to customer demand and production process, by compare with contract and drawing in order to review equipment performance, material, structure, accessories, control, instrument, etc, to confirm the rationality and reliability of products in design process.
2.     Purpose of FAT: through a series of experimental test by manufacture proves the quality and reliability of the equipment before delivery also prove the equipment can satisfy the basic requirements of design confirmation, products standard and international requirements of GMP.
3.     Purpose of IQ: by installation, commissioning and validation activities,a series of data were offered to validate if installation documents & conditions & outcome of stability testing case can comply with the design requirements, datum and document can meet the requirements of GMP management.
4.     Purpose of OQ: check instrumental and test report supplied by validate side at first, check and test equipment technology parameter, confirm the operation of equipment performance meet the design requirements, and related requirements in accordance with GMP requirements.
5.     Purpose of PO: by the qualification of installation and operational confirmation, test corresponding sample based on the specific craft of customer manufacturer, confirm the operation of equipment performance meet the design requirements, and related requirements in accordance with GMP requirements.

 


The new generations of stability test chamber, assemble year’s experience of design and production, and introduce into German technology, breach the defect of existing cast which can not endure long time and continuous operation. It adopting advanced technology of double compressor takes turns switch, and main imported parts performance is stable and reliable.

1.      Imported closed compressor, use R**4a environmental protection refrigerants, low noise, high efficiency, long service life.
2. Imported touch screen controller, large process control, a precise and reliable control, with R**2 interface.
3. Data record, online data acquisition, imported recorder with paper, two data recording mode selection.

国家: China
型号: YP series
离岸价格: 获取最新报价
位置: -
最小订单价格: -
最小订单: 1 Piece
包装细节: plywood
交货时间: 20 days
供应能力: -
付款方式: PayPal, L/C, T/T
產品組 : -

Send a direct inquiry to this supplier

至:

Mr. Kevin < ALP Technology >

我想知道: