联系人 Bhanu
Mumbai, Maharashtra
Stir the Base part thoroughly. Mix
the base and Paste as per our
recommended ratio of 9 : 1 by volume. Stir &
mix thoroughly to attain homogeneity.
2. Add AK **8 thinner into the mix, if required, depending
on
application method, and stir thoroughly for few minutes.
3. The temperature of the substrate should be minimum 3°C above the
dew
point of the air, temperature and relative humidity measured in the
vicinity
of the substrate.
4. Good ventilation is usually required in confined areas to ensure
correct
drying.
5. All equipments used for above should be properly cleaned
国家: | India |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |