联系人 Mr. Peter
Xianrentun, Linhai, Zhejiang
Use 1. Stone material dry-applying in binding; 2. Structural Reinforcement; 3. Bridge, construction, connection of prefabs of highway etc. Use Method 1. Clean the surface to be bound; 2. Blend the group A and group B according to 2:1 to 1:1 ratio; 3. Apply the glue with steel scrapers or other tools. Matters needing attentions 1. Heavy load is not allowed at the initial stage of the solidification of the dry-applying glue; 2. If the surface to be bound is too smooth, the rough treatment should be conducted firstly; 3. The effective time after the blending is ****5 min; 4. The initial solidifying time is ****0 min and after *4 hr the solidification is complete. 5. Please do not put the remained glue after the blending back to the original pail. Storing Stored at dry and ventilated places with the shelf life of *2 month. Packing and Specifications Packed in plastic pots with the specifications of 1 L, 5 L and *0 L etc. Use 1. Stone material dry-applying in binding; 2. Structural Reinforcement; 3. Bridge, construction, connection of prefabs of highway etc. Use Method 1. Clean the surface to be bound; 2. Blend the group A and group B according to 2:1 to 1:1 ratio; 3. Apply the glue with steel scrapers or other tools. Matters needing attentions 1. Heavy load is not allowed at the initial stage of the solidification of the dry-applying glue; 2. If the surface to be bound is too smooth, the rough treatment should be conducted firstly; 3. The effective time after the blending is ****5 min; 4. The initial solidifying time is ****0 min and after *4 hr the solidification is complete. 5. Please do not put the remained glue after the blending back to the original pail. Storing Stored at dry and ventilated places with the shelf life of *2 month. Packing and Specifications Packed in plastic pots with the specifications of 1 L, 5 L and *0 L etc.
国家: | China |
型号: | epoxy B |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |