EPC SOLAR POWER PLANT PROJECT
IN JAPAN FOR FIT PRICE JY*9.8/KWH X *7 YEARS
CAPACITY **5.1KW
FIT PRICE JY*9.8/KWH X *7
YEARS (ALREADY INSTALLED
AND ON GRID NOW)
LOCATION OF LAND: KASHIMA-SHI, IBARAKI, JAPAN
SALES PRICE WITH LAND :
JY**1,**0,**0.-(ABT.USD**1,**7.*1)
ACTUAL INCOME From
Tepco/Japan:
fm Oct., ***0 to Sep,***1: Jy*2,**5,**0/-(abt.
Usd*7,**5.*8)
fm Oct.,***1 to Sep., ***2: JY*2,**7,**5/-(Abt. Usd*8,**0.*4)
fm Oct.,***2 to Sep., ***3: JY*2,**6,**6/-(Abt. Usd*8,**9.*1)
Expecting Total profit after deducting cost of every year for *7
years: JY**2,**1,**2.-(Abt. Usd**1,**0.*3, after deducting cost of
equipment)
SCOPE OF SUPPLY:-
A. HOT DIP SCREW PILE FOR SOLAR PANEL MOUNT
B. ALUMINIUM MOUNT FOR SOLAR PANEL. *0 YEARS WARANTEE
C. SOLAR PANEL JINKO **0W, **0W, MON CLYSTAL
*0 YEARS PRODUCTS WARANTEE, *5 YEARS FUNCTION
WARANTEE
D. POWER CONDITIONER OMRON 9.9KW X *5 UNITS **8.5KW
WITH *0 YEARS WARANTEE.
E. SECULITY SYSTEM LOOP MIELOOP.
F. FENCE 1.5M HEIGHT
G. ALREADY INSTALLED AND ON GRID TO TEPCO/JAPAN
H. LAND
MAINTENANCE CHARGE JY**6,**6/YEAR HAVE TO PAY EVERY YEAR.
SECURLITY SYSTEM SURBER CHARGE JY*3,**0/YEAR AND
SURBER CONTRACT CHARGDE JY**4,**0.- HAVE TO PAY SEPARATELTY,
MAINTENACNE DETAILS:-
A. GRASS CUTTING TWO TIMES PER YEAR
B. PANEL CLEAING ONE TIME PER YEAR.
C. EQUIPMENT INSPECTION AND ELECTRIC EQUIPMENT INSPECTION AND
REPORT ONE TIME PER YEAR.
MADE BY NIHON ECO SOLAR, IBARAKI, JAPAN
IF ANY QUESTION, PLEASE DONOT HESITATE TO ASK US BY EMAIL OR
WHATSUPP.
国家: | Japan |
型号: | - |
离岸价格: | 0 ~ 693836 获取最新报价 |
位置: | JAPAN |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | Prompt |
供应能力: | 1 Set |
付款方式: | - |
產品組 : | EPC Solar power plant project |