Technical details of
hydrostatic test machine on concrete
pipes
1. Test pressure:
from 0 up to 1.4 bar maximum.
2. Minimum pipe ID:
**0 mm; Maximum pipe ID: ***0 mm
3. Maximum water
filled pipe weight: ****6.*4kgf
4. Length of pipe: ID
*******0 mm, the length of pipe is ***3 mm; ID ********0 mm, the
length of the pipe is ***3 mm
5. Distance between
the two testing plates: ********0mm
6. Maximum pipe OD:
***0mm
7. Quantity of rubber
plates: 2 pcs
8. Tested pipe
pieces: two halves pipes only at the same
time
9. Capacity of
hydraulic cylinder for deflection test: *2
tons
*0. Computer
controlled
*1. Power supply: **5
V; *0 Hz
Computer controlled operation
sequences of hydrostatic test
machine
The operating
sequences are as follows:
1. Switch on computer
controlled system; put the following technical parameters into
the computer: a) diameter of testing concrete pipe; b) testing
pressure; c) testing time etc.
2. When the pipe is lifted onto the supporting table,
the pushing oil cylinder will go up or down through oil cylinder
for lifting manually in order to be at the center of the pipe.
Then computer will start the second working procedure (the
solenoid valve of pushing oil cylinder will be switched on), the
testing plate will be pushed forward to seal off the two ends of
the concrete pipe.
3. The computer will start the third working
procedure; switch on the solenoid valve of water filling, start
water filling pump to fill water inside the concrete pipe. When
air evacuation valve has effluent water, the pipe has been filled
water fully. Then, water filling pump, solenoid valves for both
water filling and air evacuation will be switched off
automatically.
4. The computer will start the fourth working
procedure; switch on solenoid valve of pressure testing, start
the pressure pump to increase pressure; when the pressure has
been raised to the testing pressure rating, pressure pump and
solenoid valve of pressure testing is to be switched off
automatically. After keeping concrete pipe under the pressure for
some minutes and if there is zero pressure leakage occurred, the
test is passed; then green light will be illuminated; and if the
test is failed, the red light will be illuminated. Then a test
report will be printed automatically.
5. The computer
will start the fifth working procedure; the water will be drained
to the tank automatically; then the testing plate will be
moved backward automatically, then the
supports of supporting table will move to right direction to let
the pipe off the fixed testing plate; after that, the supporting
table will move out of the test machine to complete this
hydrostatic test.
国家: |
China |
型号: |
OD:4440
|
离岸价格: |
120 / Piece (面議)
获取最新报价
|
位置: |
China |
最小订单价格: |
120 per Piece |
最小订单: |
1 Set |
包装细节: |
seaworthy packaging |
交货时间: |
4 months |
供应能力: |
12 Set per Year |
付款方式: |
Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
產品組 : |
RCP pipe making machine
|