离岸价格
获取最新报价|
1 Minimum Order
国家:
China
型号:
PX- 10- 02
离岸价格:
位置:
SHENZHEN
最小订单价格:
-
最小订单:
1
包装细节:
-
交货时间:
within 7working days
供应能力:
1000
付款方式:
-
The steel mould is composed of decades of steel moulding boards and work pieces. The steel mould is applied to construct the concrete digester of the Puxin biogas plant. It is a very simple and easy job to build the concrete digester by applying the steel mould, because for the constructers the blueprints are not needed, to master the steel mould is the only skill required. So, the speed and quality of the construction can be greatly increased by using the steel mould. By using a steel mould a 6 or *0 m3 Puxin biogas digester can be build in two days, or **0 in a year. The steel mould is reusable and can be used for hundreds of times, last over ten years.
国家: | China |
型号: | PX- 10- 02 |
离岸价格: | 获取最新报价 |
位置: | SHENZHEN |
最小订单价格: | - |
最小订单: | 1 |
包装细节: | - |
交货时间: | within 7working days |
供应能力: | 1000 |
付款方式: | - |
產品組 : | family size biogas system |