看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
fully automatic transformer oil BDV tester, oil analyzer

fully automatic transformer oil BDV tester, oil analyzer

离岸价格

获取最新报价

|

Minimum Order

位置:

-

最小订单价格:

-

最小订单:

-

包装细节:

-

交货时间:

-

供应能力:

-

付款方式:

-

现在联系
免费会员

联系人 Ms. Abby

No. 11 zhangping Street, Jiulongpo, Chongqing, Chongqing

现在联系

详情


Contact: Ms Abby
T/F: **************6
Cell: **6 **********6
Skype ID: topoilpurifier
Yahoo messenger ID: topoilpurifier
Hotmail ID: topoilpurifier
 
Application:
IIJ series fully automatic oil tester is designed as per the requirement of IEC**6 Testing Method of Insulation Oil Medium Strength, which via proper programming, has got functions of auto boosting, step down, stirring, display and print out. After breakdown of oil medium, HV break off will operate within *0 seconds to enable an auto isolation of control system partly; this effectively safeguards the personnel security and equipment safety. The tester is suited for testing of the strength of insulating oil medium, as well as for testing of withstands voltage of transformer oil.
 
Features :
1) Fully automatic, control by microcomputer, utilization of new I/O terminal.
2) Numbers of times of testing and idling time of stirring are set via digital setting.
3) Test results displayed and printed out automatically.
4) Strong capability of anti-interference.
5) High accuracy of testing and high capacity of anti-jamming.
6) Easy to operate, small size, light weight which operated in the open air very conveniently and convenient for maintenance
7) Can store *9 groups oil testing data which is convenient to reading and print. The testing data can keep **0 years under the condition of power off.
8) System time can go on running under power off.(the system time just for reference can not be the standard of timing)
 
Technology and parameter data
1. Power supply: AC**0V *0%, *0 HZ
2. Voltage output: *0 KV, *0KV, **0KV
3. Capacity: 1.6KVA, 2.0KVA
4. Pressure increase rate : About 2 KVA/S
5. Pressure testing speed: 3%
6. Break down sensitivity : <2KV
7. Wave form distortion :≤3%
8. Time of break down: ≤*0ms
9.  Operational environment: Temperature:0°C**0°C, Humidity: the most relative humidity*5%
*0. Storage environment : Temperature:**0°C**0°C, Humidity: the most relative humidity*5%.
*1. Operational height: <**0m (can be specially designed if the height is over ***0m)
*2. Test cell: Glass, volume **0 to **0 ml, with protective cover and stirrer.
*3. Electrodes: Stainless steel spherical *6 mm diameter/hemispherical *5 mm radius,   2.5 mm gap as per IEC***6.
*4. Nitial stand time of oil sample: **0 seconds
Intermediate stand time of oil sample: *0 seconds
String time of oil sample:  *0 seconds
Number of consecutive test: 6
*5.Weight: *8kg

Send a direct inquiry to this supplier

至:

Ms. Abby < TOP Used Oil Purification Equipment Manufacture Co., Ltd >

我想知道: