Construction of plant for the oil
processing The land is located in Kiev region, *0
kilometers from Kiev. There is total 2 hectares of the land for
construction. Convenient place position, as on one side the
Dnipro river flows, on the other hand the road, and very
comfortable to drive up.
Subject of invest is Shed
construction Construction of hangar in Kiev
region: -the construction of hangar will take from 2
month to 3 months -the cost of the construction of the hangar,
warehouse depends solely on its
parameters -carry out a variety of engineering services,
install the equipment, etc ~ *2 $ / square meter
(****0х*2 = $
*****0)