China
联系人 May
Room 8-6006 Block A-2 Taskin City Plaza No.,868 Yingxin Road, Changsha, Hunan
1 The rig is equipped with wheel running gear andhydraulic cylinder
pillar, the whole relocation convenient, easy to rig thelevel of
adjustment;
2 The oil pressure to enter institutions, improve drilling
efficiency;
3 rig equipped with a cassette holding mechanism on the ball
insteadof a chuck, can be implemented without stopping the machine
down lever, highefficiency, easy operation, safe and
reliable;
4 with socket pressure gauge indicates pressure, easy to grasp
thehole situation;
5 from the drop tower is hydraulically operated, convenient
andreliable;
6 diesel engine with electric start, reduce labor intensity;
Technological Data Style :LG***0Y |
|
Drilling depth(m) |
******0 |
Drilling hole diameter(mm) |
**0 |
Final hole diameter(mm) |
*5 |
Drilling rod diameter(mm) |
****9 |
Head angle range(°) |
*0~*5 |
Spindle straight speed(r/min) |
*0——***0(十档) |
Spindle against speed(r/min) |
*9——**7(二挡) |
Spindle stroke(mm) |
**0 |
Lifting capacity(single )Max(KN) |
*0 |
Lifting speed (m/s) |
0.**1.9 |
Motor (power)KW |
*2 |
国家: | China |
型号: | - |
离岸价格: | ( Negotiable ) 获取最新报价 |
位置: | changsha |
最小订单价格: | - |
最小订单: | 1 Acre |
包装细节: | wooden |
交货时间: | 15days |
供应能力: | 45 Acre per Month |
付款方式: | T/T, Western Union, Money Gram, PayPal, Other |
產品組 : | drill rigs |